General Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 | | DONE |
Clint A Smith
|
|
|
Work is complete. Permit finaled.
|
DOC - Permit Finaled | 7/6/2011 | 7/6/2011 | 7/6/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | PART |
Tony Young
|
|
|
verbal corrections on daily clean up
|
BMP Violation | 4/12/2011 | 4/14/2011 | 4/14/2011 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 4/12/2011 | 4/12/2011 | 4/12/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Protect both stirm drain inlets with approved inlet protection. Clean up all hard surfaces of all sediment and debris. Will re-inspect on 4/14/2011PM.
|
Site Preparation | 2/21/2011 | 2/24/2011 | 2/24/2011 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 2/21/2011 | 2/21/2011 | 2/21/2011 | | CANC |
Clint A Smith
|
|
|
Holiday.
|