Aging Inspection | 4/6/2012 | 4/6/2012 | 4/9/2012 | | DONE |
Clint A Smith
|
|
|
Permit finalled due to project area is in vertical construction. Site development is complete.
|
DOC - Permit Finaled | 4/6/2012 | 4/6/2012 | 4/6/2012 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 2/5/2012 | 2/5/2012 | 2/6/2012 | | PART |
Clint A Smith
|
|
|
Vertical construction is occuring under seperate permits by Tahoe Homes.
|
Aging Inspection | 12/5/2011 | 12/5/2011 | 12/5/2011 | | DONE |
Clint A Smith
|
|
|
No activty has begun yet,
|
Aging Inspection | 10/4/2011 | 10/4/2011 | 10/4/2011 | | FAIL |
Eric Strole
|
|
|
no corrections have been made from previous inspection.
|
General Inspection | 8/2/2011 | 8/22/2011 | 8/22/2011 | A | FAIL |
Clint A Smith
|
|
|
Site has been inactive over 14 days. Temporary and or perminate stabilization has not been initated.
|
General Inspection | 8/2/2011 | 8/2/2011 | 8/2/2011 | A | FAIL |
Clint A Smith
|
|
|
Due to inactivty of the sub division developement. 14 days from today the site must be begin to temporarly stabilize or perminately stabilize all disturbed soil. Placed a call into the RP over the schedule. Will re-inspect on 8/20/2011 being 14 work calender days from todays date.
|
BMP Violation | 6/6/2011 | 6/7/2011 | 6/7/2011 | A | PART |
Clint A Smith
|
|
|
Inlets are protected and cleaning up the hard surfaces.
|
BMP Violation | 6/6/2011 | 6/6/2011 | 6/6/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris off of all hardsurfaces. Protect all storm drains within alley ways. Will re-inspect on 6/7/2011AM.
|
Tracking Control | 4/8/2011 | 4/11/2011 | 4/11/2011 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 4/8/2011 | 4/8/2011 | 4/8/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all hard surfaces of all sediment and debris and stock pile of material. Follow up with a sweep over all surfaces that impact the storm drains. Will follow up on 4/11/2011am.
|
BMP Violation | 3/23/2011 | 3/24/2011 | 3/24/2011 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 3/23/2011 | 3/23/2011 | 3/23/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install ALL storm drain inlet protection per the manufactures specifiations. Will re-inspect on 3/24/2011AM.
|
General Inspection | 3/16/2011 | 3/16/2011 | 3/16/2011 | P | PASS |
Steven Webb
|
|
|
No activity occurring due at the time of the inspection.
|
BMP Violation | 3/14/2011 | 3/15/2011 | 3/15/2011 | A | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 3/10/2011 | 3/14/2011 | 3/14/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install the additional BMP's to the project areathat are shown on the ESC plan map that was approved per Boise City Erosion Control. (Storm drain inlet protection, Filtrex sock on curb cut out, and stabilized construction exits) ** Will allow the exits to be constructed with 2" cruched concrete. If it starts to be broken down dur to traffic the RP is required to do a top dressing of 2" or greater washed rock or 2" or greater basalt angular rock. Install all storm drain inlet protection per the manufactures specifications. Clean up all sediment deposits on the hard surfaces. Will re-inspect on 3/15/2011AM.
|
General Inspection | 3/9/2011 | 3/9/2011 | 3/9/2011 | | NR |
Steven Webb
|
|
|
Work has not started, talked to J. Conger, project will start this Friday or next week. Will perform site preparation inspection next in the next few days. Informed RP (Jim) just to implement BMP's per plan prior to start of grading.
|