Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC11-00102
StatusFinaled
Name JIM CONGER
Site Address 3800 S ECKERT RD
Project NameMILL DISTRICT SQUARE
Customer Number 
ePlanReviewNo
Description
Site Developement Only. No vertical construction.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection4/6/20124/6/20124/9/2012 DONE
DetailsClint A Smith
Permit finalled due to project area is in vertical construction. Site development is complete.
DOC - Permit Finaled4/6/20124/6/20124/6/2012PPASS
DetailsClint A Smith
Aging Inspection2/5/20122/5/20122/6/2012 PART
DetailsClint A Smith
Vertical construction is occuring under seperate permits by Tahoe Homes.
Aging Inspection12/5/201112/5/201112/5/2011 DONE
DetailsClint A Smith
No activty has begun yet,
Aging Inspection10/4/201110/4/201110/4/2011 FAIL
DetailsEric Strole
no corrections have been made from previous inspection.
General Inspection8/2/20118/22/20118/22/2011AFAIL
DetailsClint A Smith
Site has been inactive over 14 days. Temporary and or perminate stabilization has not been initated.
General Inspection8/2/20118/2/20118/2/2011AFAIL
DetailsClint A Smith
Due to inactivty of the sub division developement. 14 days from today the site must be begin to temporarly stabilize or perminately stabilize all disturbed soil. Placed a call into the RP over the schedule. Will re-inspect on 8/20/2011 being 14 work calender days from todays date.
BMP Violation6/6/20116/7/20116/7/2011APART
DetailsClint A Smith
Inlets are protected and cleaning up the hard surfaces.
BMP Violation6/6/20116/6/20116/6/2011PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment and debris off of all hardsurfaces. Protect all storm drains within alley ways. Will re-inspect on 6/7/2011AM.
Tracking Control4/8/20114/11/20114/11/2011APASS
DetailsClint A Smith
Tracking Control4/8/20114/8/20114/8/2011PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all hard surfaces of all sediment and debris and stock pile of material. Follow up with a sweep over all surfaces that impact the storm drains. Will follow up on 4/11/2011am.
BMP Violation3/23/20113/24/20113/24/2011APASS
DetailsClint A Smith
BMP Violation3/23/20113/23/20113/23/2011AFAIL
DetailsClint A Smith
Verbal to RP:
Install ALL storm drain inlet protection per the manufactures specifiations. Will re-inspect on 3/24/2011AM.
General Inspection3/16/20113/16/20113/16/2011PPASS
DetailsSteven Webb
No activity occurring due at the time of the inspection.
BMP Violation3/14/20113/15/20113/15/2011ACANC
DetailsClint A Smith
Site Preparation3/10/20113/14/20113/14/2011PFAIL
DetailsClint A Smith
Verbal to RP:
Install the additional BMP's to the project areathat are shown on the ESC plan map that was approved per Boise City Erosion Control. (Storm drain inlet protection, Filtrex sock on curb cut out, and stabilized construction exits)
** Will allow the exits to be constructed with 2" cruched concrete. If it starts to be broken down dur to traffic the RP is required to do a top dressing of 2" or greater washed rock or 2" or greater basalt angular rock.
Install all storm drain inlet protection per the manufactures specifications.
Clean up all sediment deposits on the hard surfaces. Will re-inspect on 3/15/2011AM.
General Inspection3/9/20113/9/20113/9/2011 NR
DetailsSteven Webb
Work has not started, talked to J. Conger, project will start this Friday or next week. Will perform site preparation inspection next in the next few days. Informed RP (Jim) just to implement BMP's per plan prior to start of grading.