General Inspection | 5/3/2011 | 5/3/2011 | 5/3/2011 | | DONE |
Clint A Smith
|
|
|
Permit finalled.
|
DOC - Permit Finaled | 5/3/2011 | 5/3/2011 | 5/3/2011 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 3/31/2011 | 4/4/2011 | 4/4/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/31/2011 | 3/31/2011 | 3/31/2011 | | PART |
Clint A Smith
|
|
|
Spoke with excavating contractor and asked him to clean up the sediment and debris off the hard surfaces prior or any storm events and or by 4/1/2011 PM. Will re-inspect on 4/4/2011
|
Site Preparation | 3/15/2011 | 3/16/2011 | 3/16/2011 | P | PASS |
Clint A Smith
|
|
|
Waiting on good weather to begin the project.
|
Site Preparation | 3/14/2011 | 3/15/2011 | 3/15/2011 | A | NR |
Clint A Smith
|
|
|
Meeting RP at 2:30pm on 3/16/2011
|
Site Preparation | 3/14/2011 | 3/15/2011 | 3/14/2011 | A | CANC |
Clint A Smith
|
|
|
duplicate
|
Site Preparation | 3/10/2011 | 3/14/2011 | 3/14/2011 | A | DONE |
Clint A Smith
|
|
|
Staging equiptment but will not begin until tomorrow. will re-inspect on 3/15/2011
|
General Inspection | 3/10/2011 | 3/10/2011 | 3/10/2011 | | NR |
Clint A Smith
|
|
|
|