Site Final | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PASS |
Jim Sly
|
|
|
Kelly phone
|
DOC - Permit Finaled | 6/16/2011 | 6/16/2011 | 6/16/2011 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 4/26/2011 | 4/27/2011 | 4/27/2011 | A | PART |
Jim Sly
|
|
|
Kelly phone Called RP....Need to sweep driveway, sidewalk, gutter.
|
Random Inspection | 4/26/2011 | 4/26/2011 | 4/27/2011 | P | CANC |
Jim Sly
|
|
|
Kelly phone Re-sched....
|
Site Preparation | 4/6/2011 | 4/6/2011 | 4/6/2011 | P | PASS |
Jim Sly
|
|
|
Kelly phone
|