General Inspection | 12/6/2011 | 12/6/2011 | 12/6/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 12/6/2011 | 12/6/2011 | 12/6/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/3/2011 | 10/3/2011 | 10/6/2011 | | PASS |
Jim Johnson
|
|
|
|
General Inspection | 8/2/2011 | 8/3/2011 | 8/3/2011 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/27/2011 | 8/2/2011 | 8/2/2011 | A | FAIL |
Clint A Smith
|
|
|
Must provide a valid RP within 24hrs. If not provided within the 24hrs, a stop work order will be issued. Will re-inspect on 8//3/2011PM
|
General Inspection | 7/25/2011 | 7/25/2011 | 7/25/2011 | | FAIL |
Steven Webb
|
|
|
Project has not started but RP listed is not correct, informed COSCO and Alexia from the Eng. Firm out of Seattle, she will contact Petrol West out of Utah to inform them that they need a current certified RP.
|
General Inspection | 5/24/2011 | 5/24/2011 | 5/25/2011 | | PASS |
Mike Jordan
|
|
|
|