Site Final | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | PASS |
Daryl DeGrange
|
|
|
site clean and landscaped, filters removed final ok
|
General Inspection | 11/15/2011 | 11/15/2011 | 11/22/2011 | | PASS |
Daryl DeGrange
|
|
|
see final
|
General Inspection | 10/13/2011 | 10/13/2011 | 10/25/2011 | | PART |
Tony Young
|
|
|
|
General Inspection | 9/12/2011 | 9/12/2011 | 9/20/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 8/10/2011 | 8/10/2011 | 8/10/2011 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 8/4/2011 | 8/4/2011 | 8/5/2011 | P | PART |
Tony Young
|
|
|
working on clean up
|
General Inspection | 7/8/2011 | 7/8/2011 | 7/12/2011 | | PASS |
Tony Young
|
|
|
|
BMP Violation | 6/7/2011 | 6/7/2011 | 6/8/2011 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 6/3/2011 | 6/6/2011 | 6/7/2011 | A | CANC |
Clint A Smith
|
|
|
Moved until 6/7/2011. RP isin the process to install the sediment barriers along the front of the project back of the sidewalk.
|
General Inspection | 6/3/2011 | 6/3/2011 | 6/3/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier along bthe front of lot. Will verify on 6/6/2011AM.
|
Site Preparation | 4/29/2011 | 5/3/2011 | 5/3/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Replace the storm drain inlet protection down grade in the gutterpan. Install a sediment barrier along the north and north east of project perimeter. Also post ESC sign at the front of the project where visable from of the street.
|
Site Preparation | 4/29/2011 | 4/29/2011 | 4/29/2011 | | NR |
Clint A Smith
|
|
|
Have not begun the project.
|