Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC11-00176
StatusFinaled
Name MIKE L SMITH
Site Address 3900 E AMITY RD
Project NameSOLAIRE SUB #2
Customer Number 
ePlanReviewNo
Description
Residential Subdivision Development
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/26/20142/26/20143/4/2014 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled3/4/20143/4/20143/4/2014PPASS
DetailsAndy J. Long
Subdivision site development is complete, some construction on-going on remaining individual sites in Solaire #2 with active ESC permits. BLD permit for grading/development is already finaled. Big Springs construction will remove non-temporary BMPs once their homesites are complete.
General Inspection2/11/20142/11/20142/12/2014 PASS
DetailsEric Strole
General Inspection1/27/20141/27/20141/27/2014 PART
DetailsJim Storey
Only 1 or 2 lots left in Solaire #2. The wattle lining the Greenbelt will need to be removed before finaling permit.
General Inspection1/10/20141/10/20141/10/2014 PASS
DetailsAndy J. Long
Only 1 or 2 lots left in Solaire #2. The wattle lining the Greenbelt will need to be removed before finaling permit.
General Inspection12/26/201312/26/201312/26/2013 PASS
DetailsAndy J. Long
General Inspection12/11/201312/11/201312/11/2013 PASS
DetailsAndy J. Long
3 plots remaining. Subdivision development is complete. BMPs installed along Greenbelt. Will keep open till all plots are complete.
General Inspection11/26/201311/26/201311/26/2013 PART
DetailsAndy J. Long
Neighborhood is developed and has BMPs still implemented. SWPPP still on site. . Corrections issued to houses on Forked Deer and Epsilon. Solaire phase 2 CGP 2008 #IDR10CK66 filed April 2011 is expired. Need to confirm if project should be finaled.
General Inspection11/11/201311/11/201311/12/2013 CANC
DetailsEvan Jenkins
Holiday
General Inspection10/25/201310/25/201310/25/2013 PART
DetailsAndy J. Long
Solaire sub still has some vacant lots. Maintaining SWPPP, last self inspection was 9/26 by RP Matthew Shultz. Site looks good but Gator Guard wattles lining Greenbelt will need to be removed where land is now stabilized. Foam bits littering area. Called RP and said to remove next self inspection.
General Inspection10/10/201310/10/201310/10/2013 PASS
DetailsAndy J. Long
BMPs implemented, permit posted. No corrections
General Inspection9/25/20139/25/20139/26/2013 PASS
DetailsEric Strole
General Inspection9/10/20139/10/20139/10/2013 PART
DetailsBill VanDegrift
still working
General Inspection8/26/20138/26/20138/26/2013 PASS
DetailsEric Strole
General Inspection8/9/20138/9/20138/9/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/25/20137/25/20137/25/2013 PART
DetailsKimberly M. Johnson
Called CBH RE lot 4403 Cruzatte. Need dust control and track out cleaned up.
General Inspection7/10/20137/10/20137/10/2013 PASS
DetailsClint A Smith
General Inspection6/25/20136/25/20136/25/2013 PASS
DetailsClint A Smith
General Inspection6/10/20136/10/20136/10/2013 PASS
DetailsClint A Smith
General Inspection5/24/20135/24/20135/24/2013 PASS
DetailsClint A Smith
General Inspection5/9/20135/9/20135/9/2013 PASS
DetailsClint A Smith
General Inspection4/24/20134/24/20134/24/2013 PART
DetailsClint A Smith
Need to build out 2 lots to complete permit requirements.
General Inspection4/9/20134/9/20134/9/2013 PART
DetailsClint A Smith
NO activity on the 3 exsisting lots.
General Inspection3/25/20133/25/20133/25/2013 PASS
DetailsClint A Smith
General Inspection3/8/20133/8/20133/8/2013 PASS
DetailsClint A Smith
General Inspection2/21/20132/21/20132/21/2013 PASS
DetailsClint A Smith
General Inspection2/6/20132/6/20132/6/2013 FAIL
DetailsClint A Smith
Verbal to RP;
Provide a sediment barrier a the stock pile along the gutterpan.
General Inspection1/22/20131/22/20131/22/2013 PASS
DetailsClint A Smith
General Inspection1/7/20131/7/20131/7/2013 PASS
DetailsClint A Smith
General Inspection12/21/201212/21/201212/21/2012 PASS
DetailsClint A Smith
Per my previous visit yesterday, the devlopement project is compliant.
General Inspection12/6/201212/6/201212/6/2012 PASS
DetailsClint A Smith
General Inspection11/21/201211/21/201211/21/2012 PASS
DetailsClint A Smith
General Inspection11/6/201211/6/201211/6/2012 PART
DetailsClint A Smith
Need to clean up on a daily basis.
Tracking Control10/22/201210/22/201210/22/2012PPASS
DetailsClint A Smith
Tracking Control10/22/201210/22/201210/22/2012AFAIL
DetailsClint A Smith
Correction Notice Posted; (contacted Mike Smith RP)
Clean up all sediment and derbis off of the hard surfaces.
Maintain the storm drain inlet prtection within the north section of the project area. Failure to compl with this notice will result in a STOP WORK ORDER.
Will re-inspect on 10/22/2012 PM.
General Inspection10/12/201210/12/201210/11/2012 PASS
DetailsKimberly M. Johnson
Tracking Control9/25/20129/27/20129/27/2012APASS
DetailsClint A Smith
General Inspection9/25/20129/25/20129/25/2012 FAIL
DetailsClint A Smith
Verbal to RP:
CLean up the minor tracked sediment in the back section of the project. Will re-inspecton 9/27/2012
General Inspection9/10/20129/10/20129/10/2012 FAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment residual out of the gutter pans and maintain the storm drain inlet in the corner of Epsilon and Deer Forked.
Conference8/24/20128/24/20128/24/2012ADONE
DetailsKimberly M. Johnson
Went to site at 8:00 AM to initiate stop work order on exterior work. Noted need to clean sediment off of sidewalk/roadways. Met with superintendent who called a crew over from the neighboring sites to perform clean up actions.
BMP Violation8/23/20128/23/20128/23/2012AFAIL
DetailsKimberly M. Johnson
BMP Violation8/22/20128/22/20128/22/2012PFAIL
DetailsKimberly M. Johnson
Second correction notice issued for poor housekeeping and no ESC permit sign. Left message for Mike Smith and spoke to Mike Schultz via telephone.
General Inspection8/20/20128/20/20128/21/2012 FAIL
DetailsKimberly M. Johnson
Poor housekeeping and ESC sign not posted. Correction Notice issued and spoke with Matt Schultz and Mike Smith about violations. Discussed history of repeated violations for trash and need for proper refuse management on a daily basis.
BMP Violation8/2/20128/3/20128/3/2012APART
DetailsClint A Smith
Must keep conducting clean up on a daily basis.
Tracking Control8/2/20128/2/20128/2/2012AFAIL
DetailsClint A Smith
Final Verbal to RP:
IF violation is not corrected within the given timeframe, a STOP WORK ORDER will be posted.

Clean up all sediment off of the hard surfaces and clean up on a daily basis by the end of the work day. Will re-inspect on 8/3/2012am.
General Inspection7/23/20127/23/20127/23/2012 PASS
DetailsEric Strole
BMP Violation7/5/20127/6/20127/6/2012APART
DetailsClint A Smith
Verbal to RP;
Clean up all trash and sediment on a daily basis. Make sure all contractor utilize thewashout pit for ALL non storm water wash water from paint, stucco, mortar, and sheet rock mud. If found that the follow issued are violated, a stop work order will be issued at the time the violation is found. It will be up to the inspector discression to place on the lot the violation is found or on the whole subdivision.
BMP Violation7/2/20127/3/20127/5/2012PFAIL
DetailsClint A Smith
Additional Correction Notice:
Clean up all sediment and debris off of the hard surfaces. Provide maintenance and additional storm drain inlet protection on all storm drains with the construction areas for the project. Failure to comply with this notice will result in a STOP WORK ORDER on the Sub Division. Will re-inspect on 7/6/2012
Stop work order have been placed on 9 indivual lots though. ESC12-00270, 00271, 00277, 00415, 00494, 00565, 00458, 00416, 00513. Please see history on lots for details.
General Inspection7/2/20127/2/20127/2/2012 FAIL
DetailsClint A Smith
Correction Notice: (Verbal to RP)
1. Provide a washout for paint washouts.
2.Clean up all residual from washing out of paint prducts on the lots.

3. Clean up all hard surfaces of all sediment and debris. Disope of them in the approved proper manner.

4. Clean up all trash debris scattered though out the sub division. Remove or place the trash debris in the pprovided trash containers.
Failure to comply with the given notice, will result in a STOP WORK ORDER. Will re-inspect on 7/3/2012PM
BMP Violation6/13/20126/15/20126/19/2012APASS
DetailsClint A Smith
BMP Violation6/13/20126/13/20126/13/2012PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all trash debris scattered through out the project area an placed into the provided trash containers. Place inlet protection into the storm drain that are not protected. Clean all hard surfaces of all sediment debris. Will re-inspect on 6/15/2012AM.
General Inspection5/31/20125/31/20126/4/2012 PASS
DetailsEric Strole
BMP Violation5/14/20125/16/20125/18/2012APASS
DetailsClint A Smith
General Inspection5/14/20125/14/20125/14/2012 FAIL
DetailsClint A Smith
Verbal to RP/ GC (Mike Smith)
CLean up all hard surfaces of all sediment and debris. Will re-inspect on 5/16/2012AM.
General Inspection4/27/20124/27/20124/27/2012 PASS
DetailsBill VanDegrift
looks good not too much going on yet protection in place and most of the site is green
General Inspection4/12/20124/12/20124/12/2012 PASS
DetailsEric Strole
General Inspection3/28/20123/28/20123/28/2012 PASS
DetailsClint A Smith
General Inspection3/13/20123/13/20123/13/2012 PASS
DetailsEric Strole
General Inspection2/12/20122/12/20122/12/2012 CANC
DetailsClint A Smith
Weekend
General Inspection1/27/20121/27/20121/27/2012 PASS
DetailsEric Strole
General Inspection1/12/20121/12/20121/12/2012 PASS
DetailsClint A Smith
no activity.
General Inspection12/28/201112/28/201112/28/2011 PASS
DetailsClint A Smith
General Inspection12/13/201112/13/201112/13/2011 PASS
DetailsClint A Smith
General Inspection11/28/201111/28/201111/28/2011 PASS
DetailsClint A Smith
General Inspection11/1/201111/1/201111/1/2011 PASS
DetailsClint A Smith
General Inspection10/17/201110/17/201110/17/2011 PASS
DetailsClint A Smith
General Inspection9/30/20119/30/20119/30/2011 PASS
DetailsClint A Smith
General Inspection9/15/20119/15/20119/15/2011 PASS
DetailsClint A Smith
General Inspection8/31/20118/31/20119/1/2011 PASS
DetailsClint A Smith
General Inspection8/16/20118/16/20118/16/2011 PASS
DetailsClint A Smith
Tracking Control7/28/20117/29/20117/29/2011PCANC
DetailsClint A Smith
Moved until 8/2/2011. Will be swept at the end of the evening on 7/29/2011.
General Inspection7/28/20117/28/20117/28/2011PFAIL
DetailsClint A Smith
Verbal message to RP:
Clean up all tracking onto the hard surfaces from vechiles driving on and off of project area dur to the delivery of road base. Will re-inspect on 7/29/2011PM
General Inspection7/20/20117/20/20117/20/2011 PASS
DetailsClint A Smith
General Inspection7/5/20117/5/20117/5/2011 PASS
DetailsClint A Smith
Applied a seed, tachifier and mulch application on all perimeter slopes. Barriers a the bottom of slope are still in place.
BMP Violation6/16/20116/20/20116/20/2011APART
DetailsClint A Smith
General Inspection6/16/20116/16/20116/16/2011 FAIL
DetailsClint A Smith
Verbal to RP:
Install sediment barrier per industry standards that is located at the north east end of the project access. Also maintain the concrete washout. Have reached over 50% of capcity. Will follow up on 6/20/2011AM
General Inspection6/1/20116/1/20116/1/2011 PASS
DetailsClint A Smith
Conference5/12/20115/13/20115/13/2011ADONE
DetailsClint A Smith

Spoke with the RP. He explained that the entrance of the project will be maintained by Wensday the 5/19 after the utilies are inplace. Till that time they will sweep up all tracking onto the hard surfaces.
Conference5/12/20115/12/20115/12/2011PCANC
DetailsClint A Smith
Wrong date.
BMP Violation4/27/20114/28/20114/28/2011APASS
DetailsClint A Smith
BMP Violation4/25/20114/27/20114/27/2011AFAIL
DetailsClint A Smith
Spoke with the Grading contractor and he explained that they are waiting for the soil to dry out. But will have the area along the sediment barrier removed by the end of the day. Will re-inspect on 4/28/2011AM.
Random Inspection4/25/20114/25/20114/25/2011PPART
DetailsClint A Smith
Verbal to RP:
In the north east section of the project aarea along the perimeter BMP controls, a large of sediment deposit is collected behind the sediment barrier. It does exceed of 50% capacity. Need to maintain the sediment barrier at that section. Also informed the RP to contact the city erosion control department prior to any dewatering actvities small or large.
Will re-nspect on 4/27/2011AM.
Site Preparation4/6/20114/15/20114/15/2011PPASS
DetailsClint A Smith
Site Preparation4/11/20114/12/20114/12/2011PPASS
DetailsClint A Smith
3pm
General Inspection4/6/20114/6/20114/6/2011 NR
DetailsSteven Webb
Reviewed upcoming project with RP, Matt S. Will follow up.
General Inspection2/27/20122/27/2012   
DetailsJim Storey