DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/8/20168/8/20168/8/2016 PASS
DetailsAndy J. Long
Subdivision is stabilized, no active SFHs in progress. New Somerset Phase in progress below. No further inspections required on this permit. New homes will have individual permits. Jayo in control sediment bags currently.
DOC - Permit Finaled8/8/20168/8/20168/8/2016PPASS
DetailsAndy J. Long
General Inspection7/22/20167/22/20167/22/2016 PEND
DetailsEvan Jenkins
re-veg the rest of the disturbed areas
General Inspection7/7/20167/7/20167/7/2016 CANC
DetailsAndy J. Long
General Inspection6/22/20166/22/20166/22/2016 PASS
DetailsEvan Jenkins
only 1 vacant lot left.
all other SFH's complete
no esc issues observed
Complaint Inspection6/6/20166/7/20166/6/2016APASS
DetailsEvan Jenkins
check for stockpiling and runoff risk at end of Ridgeline.

100 degrees out. No dust or runnoff occuring. Stockpiling is a normal aspect of contruction. No ESC issues observed at time of inspection
General Inspection5/30/20165/30/20165/30/2016 CANC
DetailsEvan Jenkins
Holiday
General Inspection5/13/20165/13/20165/13/2016 PASS
DetailsAndy J. Long
General Inspection4/28/20164/28/20164/28/2016 PASS
DetailsEvan Jenkins
General Inspection4/13/20164/13/20164/13/2016 PASS
DetailsAndy J. Long
No subdivision or SFH activity currently in Somerset Ridge. No hillside erosion or trackout on open lots. Areas have vegetated. May consider clsoing permit and having SFHs be responsble for inlet protection maintenance.
General Inspection3/29/20163/29/20163/29/2016 PASS
DetailsAndy J. Long
No subdivision or SFH work occuring in Somerset Ridge. No loose sediment leaving the undeveloped parcels. Storm drains have filter bags installed.
General Inspection3/14/20163/14/20163/14/2016 PASS
DetailsEvan Jenkins
General Inspection2/26/20162/26/20162/26/2016 PASS
DetailsEvan Jenkins
General Inspection2/11/20162/11/20162/11/2016 PASS
DetailsAndy J. Long
General Inspection1/27/20161/27/20161/27/2016 PASS
DetailsEvan Jenkins
General Inspection1/12/20161/12/20161/12/2016 PASS
DetailsAndy J. Long
General Inspection12/28/201512/28/201512/28/2015 CANC
DetailsAndy J. Long
General Inspection12/11/201512/11/201512/11/2015 PASS
DetailsAndy J. Long
No activity. Runoff is clear. Some minor trackout on Heavens Way due to joy riders on mud. Jayo will clean up.

Approved.
General Inspection11/26/201511/26/201511/27/2015 PASS
DetailsBill VanDegrift
General Inspection11/11/201511/11/201511/12/2015 PASS
DetailsAndy J. Long
General Inspection10/27/201510/27/201510/27/2015 PASS
DetailsEvan Jenkins
General Inspection10/12/201510/12/201510/13/2015 PASS
DetailsAndy J. Long
General Inspection9/25/20159/25/20159/25/2015 PASS
DetailsEvan Jenkins
General Inspection9/10/20159/10/20159/10/2015 PASS
DetailsAndy J. Long
NO new subdivision activity. Streets and gutters are free of loose sediment and trackout. 3 active SFHs are in good condition. No corrections issued.
General Inspection8/26/20158/26/20158/26/2015 PASS
DetailsAndy J. Long
3 active SFHs in Somerset Ridge. Streets and gutters are clean, no discharges, loose sediment, or other materials . Trash is being contained. DI bags are installed.

Since subdivision was graded many years ago, cut hills have vegetated and are stable. Empty lots have perimeter wattles installed at driveway aprons to contain sediment runoff. No corrections at this time.
General Inspection8/11/20158/11/20158/11/2015 PASS
DetailsAndy J. Long
Somerset Ridge has 1 active home in progress. Vacant lots have sediment control wattles installed at driveway aprons. Disturbed hillside has long vegetated. DI bags installed. Approved.
General Inspection7/27/20157/27/20157/27/2015 PASS
DetailsEvan Jenkins
2 SFH's currently being constructed. No ESC issues observed at this time
General Inspection7/10/20157/10/20157/10/2015 PART
DetailsEvan Jenkins
Some minor discharges of vacant lots.
sweep sediment back onto lots
General Inspection6/25/20156/25/20156/25/2015 PASS
DetailsAndy J. Long
No hillside erosion, fugitive dust, or discharges observed from active projects. Open areas have revegetated well or are compacted dirt/sand.
General Inspection6/10/20156/10/20156/10/2015 PEND
DetailsEvan Jenkins
Approximately 50% of open lots have re-vegetated from volunteer vegetation. No issues at this time
General Inspection5/26/20155/26/20155/26/2015 PASS
DetailsAndy J. Long
No subdivision work. No disturbed or damanged hillsides around Somerset Ridge. SFHs in progress and sites are keeping in compliance and making corrections as needed/requested. Approved.
General Inspection5/11/20155/11/20155/11/2015 PASS
DetailsEvan Jenkins
No offsite discharges occuring. No ESC issues at time of inspection
General Inspection4/24/20154/24/20154/24/2015 PASS
DetailsAndy J. Long
General Inspection4/9/20154/9/20154/9/2015 PASS
DetailsAndy J. Long
Individual homes in progress. No subdivision BMP corrections needed.

Investigating dirt stockpiles being stored at the end of Ridgeline
General Inspection3/25/20153/25/20153/25/2015 PASS
DetailsAndy J. Long
No trackout from open parcels. 1 active home under construction, two on Heaven's Way getting finishing touches. DI bags have adequate capacity. No corrections at this time.
General Inspection3/10/20153/10/20153/11/2015 PART
DetailsEvan Jenkins
Sediment on all active construction sites on sidewalks. Talked with Contractors to sweep up at the end of day, especially since we are expecting rains in the region this afternoon. They agreed they would
Complaint Inspection2/20/20152/23/20152/23/2015APEND
DetailsAndy J. Long
unauthorized hillside grading is reportedly occuring nearby somerset ridge... not necessarily associated with this project.

Stockpiles in area have been recently moved and added to. Unclear who is doing the work. It does not appear to be grading but stockpiling in previously disturbed area.

Investigating the source and need for permit and perimeter controls.
General Inspection2/12/20152/12/20152/12/2015 PASS
DetailsEvan Jenkins
General Inspection1/28/20151/28/20151/28/2015 PART
DetailsAndy J. Long
Somerset Ridge BMPs installed and open lots have sediment containment wattles at curb aprons. Some trackout from open lots by unauthorized use/joyriders has occured, may need construction fencing on lots on Heaven's Way where it is more frequent; but there is more winter road sand than track out. As weather improves and the two homes on Heaven's Way are complete, will require street sweeper.



Drop inlet bags need maintenance and reinstall.
CN issued SFHs to clean up the wind blown trash from their waste bins.

No hillside erosion or muddy runoff occuring.
Random Inspection1/13/20151/13/20151/13/2015PPART
DetailsAndy J. Long
Empty lots on Somerset Ridge #5 have BMPs installed (wattles & silt fence) in areas as needed. Contractors have been instructed to stay off empty lots to prevent trackout.

Correction:

Need to do maintenance on drop inlet filter bags on Orion and Heaven's Way. They are currently full of road sand and sediment from sites.
General Inspection1/7/20151/7/20151/7/2015 PASS
DetailsEvan Jenkins
No ESC Issues at this time
General Inspection12/23/201412/23/201412/23/2014 PASS
DetailsAndy J. Long
No new subdivision activity on Somerset Ridge. SFHs in progress. Empty lots have perimeter BMPs. No hillside erosion observed.
General Inspection12/8/201412/8/201412/8/2014 PASS
DetailsAndy J. Long
No subdivision development activities occuring, 3 individual SFHs with seperate permits are in progress. Storm drain inlet bags have remaining capacity. No trackout from open lots and no hillside erosion observed. Note - there is still a lot of sand on the road from the winter road safety efforts.
General Inspection11/21/201411/21/201411/21/2014 PASS
DetailsAndy J. Long
No subdivion work occuring in Somerset Ridge. 2 SFH homes in progress with permits. No issues or corrections at this time.
General Inspection11/5/201411/6/201411/6/2014PPASS
DetailsAndy J. Long
General Inspection11/5/201411/5/201411/5/2014 CANC
DetailsAndy J. Long
rescheduled for 11/6
General Inspection10/21/201410/21/201410/21/2014 PASS
DetailsAndy J. Long
Somerset Ridge does not have any current erosion or sediment runoff issues. Wattles are installed on vacant lots and downstream drop inlet has adequate filter bag capacity. Two SFHs are currently in progress. Contractors are staying off vacant lots.

Approved.
General Inspection10/6/201410/6/201410/6/2014 PASS
DetailsEvan Jenkins
No esc issues observed at this time. only vertical construction taking place
Complaint Inspection10/6/201410/6/201410/6/2014PCANC
DetailsEvan Jenkins
Entered Incorrect ESC Number
General Inspection9/19/20149/19/20149/19/2014 PASS
DetailsEvan Jenkins
only vertical construction taking place at this time. no esc issues at this time
General Inspection9/4/20149/4/20149/4/2014 PASS
DetailsAndy J. Long
2 new units are under construction in Somerset Village. Roads and gutters are clear, contractors are staying off open lots, and a concrete washout has been provided. Jayo ESC crew has been responsive/active.

No corrections at this time.
General Inspection8/20/20148/20/20148/20/2014 PASS
DetailsEvan Jenkins
vegetation growing in good.
No ESC Issues at this time
General Inspection8/5/20148/5/20148/5/2014 PASS
DetailsEvan Jenkins
no issues at time of inspection
General Inspection7/21/20147/21/20147/21/2014 PASS
DetailsAndy J. Long
Somerset Ridge #5 is in compliance. Stormdrains have filter protection. No sediment issues on sidewalks and gutters. Hillsides and flat parcel have vegetated. Some parcels are complacted sand. 2 SFH projects are in progress.
General Inspection7/4/20147/4/20147/7/2014 CANC
DetailsAndy J. Long
holiday
General Inspection6/19/20146/19/20146/19/2014 PASS
DetailsEvan Jenkins
no issues at time of inspection
General Inspection6/4/20146/4/20146/4/2014 PASS
DetailsEvan Jenkins
vegetation slowly growing in.
no esc issues at time of inspection
General Inspection5/20/20145/20/20145/20/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspetion
General Inspection5/5/20145/5/20145/5/2014 PASS
DetailsAndy J. Long
BMPs in good condition. The mulching/hydoseed applications have stabilized dirt with tacifier, but not yet fully vegetated.

No trackout or hillside erosion observed. 2 houses in progress also no violations observed.
Site Preparation4/17/20144/18/20144/18/2014APASS
DetailsAndy J. Long
Note- not a site prep inspection, human error.

Somerset Ridge has two individual projects in progress. No trackout. BMPs installed. Hydroseed has been placed on slopes and is effective yet no vegetation. ESC permit and SWPPP at bottom of Orion.
General Inspection4/16/20144/16/20144/17/2014 CANC
DetailsAndy J. Long
reschedueled for 4/18
General Inspection4/1/20144/1/20144/1/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
General Inspection3/17/20143/17/20143/17/2014 PASS
DetailsAndy J. Long
Somerset Ridge #5 has no new rill erosion between lots. Roads and sidewalk are clean, BMPs installed. No correction required at this time.
General Inspection2/28/20142/28/20143/5/2014 PASS
DetailsEvan Jenkins
Some sediment on sidewalk and road near intersection of N. Pleasant Hill & Orion Dr. Minimal amount at time of insepction. Contractor to sweep up sediment from sidewalk, curb and road
Random Inspection2/13/20142/13/20142/13/2014PPART
DetailsAndy J. Long
Inspection to check hillside erosion.

No new rills or blowouts to street observed. Wattles have been retrenched as requested. Streets are clean mostly, but some sand from road safety operations.

1 new correction:

1. Need to empty DI bags
2. Sweep sidewalks
3. Concrete washout for new homes need to be installed.
General Inspection2/5/20142/5/20142/5/2014PDONE
DetailsAndy J. Long
Inspection conducted 2/4; changed permit status to ISSUED since it was finaled without being stabilized. Snowmelt runoff and precipitation in January have led to complaints and issues. Jayo did re-install wattles, but there are still issues and wattles are not trenched in. Will continue inspect site till stabilization and installation of satisfactory BMPs occurs.
General Inspection5/31/20135/31/20135/31/2013 NR
DetailsClint A Smith
DOC - Permit Finaled5/31/20135/31/20135/31/2013PPASS
DetailsClint A Smith
General Inspection5/16/20135/16/20135/16/2013 PASS
DetailsClint A Smith
Site Preparation4/30/20135/1/20135/3/2013APASS
DetailsClint A Smith
General Inspection4/30/20134/30/20134/30/2013 DONE
DetailsClint A Smith
Moved to a site prep on 5/1/2013 to assess over perimeter controls on the slopes.
Aging Inspection4/15/20134/15/20134/15/2013 CANC
DetailsClint A Smith
NO activity
General Inspection6/28/20126/28/20126/29/2012 DONE
DetailsClint A Smith
Permit expired.
DOC - Permit Expired6/29/20126/29/20126/29/2012APASS
DetailsClint A Smith
General Inspection6/12/20126/13/20126/13/2012ANR
DetailsClint A Smith
This project has not begun yet.
General Inspection6/12/20126/12/20126/12/2012 PEND
DetailsDixie Fellows
sent to clint
General Inspection5/28/20125/28/20125/28/2012 CANC
DetailsClint A Smith
Holiday
General Inspection5/11/20125/11/20125/15/2012 PEND
DetailsTony Young
General Inspection4/26/20124/26/20124/30/2012 PEND
DetailsTony Young
General Inspection4/11/20124/11/20124/19/2012 PEND
DetailsTony Young
General Inspection3/27/20123/27/20123/27/2012 PASS
DetailsDaryl Spivey
empty lot with no activity on it.......ds
General Inspection3/12/20123/12/20123/20/2012 PEND
DetailsTony Young
General Inspection2/24/20122/24/20122/24/2012 CANC
DetailsClint A Smith
General Inspection2/9/20122/9/20122/9/2012 PASS
DetailsClint A Smith
General Inspection1/25/20121/25/20121/25/2012 PASS
DetailsDaryl Spivey
no activity
General Inspection1/10/20121/10/20121/11/2012 PEND
DetailsTony Young
General Inspection12/26/201112/26/201112/27/2011 DONE
DetailsClint A Smith
no ACTIVITY YET.
Aging Inspection11/9/201111/9/201111/9/2011PCANC
DetailsClint A Smith
General Inspection11/4/201111/4/201111/9/2011 PEND
DetailsDixie Fellows
sent to clint
General Inspection10/20/201110/20/201110/20/2011 PASS
DetailsDaryl Spivey
General Inspection10/5/201110/5/201110/7/2011 PEND
DetailsTony Young
General Inspection9/20/20119/20/20119/20/2011 PASS
DetailsDaryl DeGrange
vacant lot, no activity, site clean
General Inspection9/5/20119/5/20119/6/2011 CANC
DetailsClint A Smith
Holiday
General Inspection8/19/20118/19/20118/19/2011 PASS
DetailsClint A Smith
General Inspection8/4/20118/4/20118/4/2011 PASS
DetailsClint A Smith
Site Preparation6/20/20117/20/20117/20/2011APASS
DetailsClint A Smith
Site Preparation6/7/20116/20/20116/20/2011ANR
DetailsClint A Smith
Site Preparation5/24/20116/7/20116/7/2011ANR
DetailsClint A Smith
Site Preparation5/18/20115/24/20115/24/2011ADONE
DetailsClint A Smith
Went over perimeter controls and tacking perventitive BMP's. Also informed the RP that they must develope a SWPPP and file the NOI prior to the start of any land disturbing activities. The erosion control plan is a component of the SWPPP. Will follow up in 2 weeks for anymore activity.
Site Preparation5/11/20115/18/20115/18/2011ANR
DetailsClint A Smith
site prep will occur on 5/24/2011 at 9AM.
General Inspection5/11/20115/11/20115/11/2011PDONE
DetailsClint A Smith
No actvity has begun. Left a message with the RP to set up a confrence to review over the approved set of plans and the schedule.
General Inspection11/29/201111/29/2011   
DetailsDaryl DeGrange