Site Final | 10/6/2011 | 10/11/2011 | 10/11/2011 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 9/30/2011 | 10/3/2011 | 10/5/2011 | A | PART |
Clint A Smith
|
|
|
Laying out sod today.
|
General Inspection | 9/30/2011 | 9/30/2011 | 9/30/2011 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: Provide sediment barriers along the perimeter of the front of the project area. Will re-inspect on 10/3/2011
|
BMP Violation | 9/15/2011 | 9/16/2011 | 9/16/2011 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/15/2011 | 9/15/2011 | 9/15/2011 | A | FAIL |
Clint A Smith
|
|
|
Message to the RP: (Verbal to Contractor) Clean up all stucco washout residual and all excess stucco. Provide a containment area for the stucco work occuring on the front of lot. Will re-inspect on 9/16/2011PM
|
General Inspection | 8/29/2011 | 8/29/2011 | 8/29/2011 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 7/28/2011 | 7/28/2011 | 7/29/2011 | | PART |
Dave Hannah
|
|
|
told rp to have landscaper clean up sidewalk and gutter
|
General Inspection | 6/27/2011 | 6/27/2011 | 6/27/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/27/2011 | 5/27/2011 | 5/27/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/24/2011 | 5/24/2011 | 5/25/2011 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Prior to the start of any land disturbing activities, you must have a valid ESC permit in the "Issued" status. But you install your BMP's at this time. No other work can occur past the BMP installation.
|