Site Preparation | 6/27/2011 | 6/30/2011 | 6/30/2011 | A | DONE |
Clint A Smith
|
|
|
Work has been completed. Lot stabilized.
|
DOC - Permit Finaled | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/27/2011 | 6/27/2011 | 6/27/2011 | | NR |
Clint A Smith
|
|
|
|
General Inspection | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | PASS |
Steven Webb
|
|
|
Final grading is completed, irrigation installed and bare ground seeded. Did not see any growth as of yet, permit may be finaled after achieving 70%.
|
General Inspection | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | PART |
Tony Young
|
|
|
need to cover stock piles
|
Site Preparation | 4/29/2011 | 4/29/2011 | 4/29/2011 | | PASS |
Steven Webb
|
|
|
Sign posted, storm drain protected: Main structure is gone, working on basement/foundation.
|