Site Final | 10/17/2011 | 10/17/2011 | 10/17/2011 | P | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 10/14/2011 | 10/14/2011 | 10/17/2011 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/11/2011 | 8/11/2011 | 8/12/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/11/2011 | 7/11/2011 | 7/11/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/8/2011 | 6/8/2011 | 6/10/2011 | P | PASS |
Tony Young
|
|
|
verbal corrections... minor
|
General Inspection | 6/7/2011 | 6/7/2011 | 6/7/2011 | P | PASS |
Dixie Fellows
|
|
|
john is the contact
|
Site Preparation | 5/9/2011 | 5/10/2011 | 5/10/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/3/2011 | 5/10/2011 | 5/9/2011 | A | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 5/4/2011 | 5/9/2011 | 5/9/2011 | A | NR |
Clint A Smith
|
|
|
Will begin on 5/10/2011. Will inspect on 5/11/2011AM.
|
Conference | 5/4/2011 | 5/4/2011 | 5/4/2011 | P | DONE |
Clint A Smith
|
|
|
Spoke with the home owner RP (Tim) and explained to him that on Monday the 9th of May, if the sediment barriers were not in place a stop work order will be placed on the project until the time being that the barriers are inplace. Will re-inspect for a "site preperation" inspect on 5/9/2011AM>
|
General Inspection | 5/3/2011 | 5/3/2011 | 5/3/2011 | | NR |
Clint A Smith
|
|
|
|
General Inspection | 9/13/2011 | 9/13/2011 | | | |
Dixie Fellows
|
|
|
|