Site Final | 6/12/2012 | 6/12/2012 | 6/12/2012 | A | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 6/12/2012 | 6/12/2012 | 6/12/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 4/27/2012 | 4/27/2012 | 4/27/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 3/12/2012 | 3/12/2012 | 3/20/2012 | | PASS |
Tony Young
|
|
|
|
General Inspection | 1/23/2012 | 1/24/2012 | 1/23/2012 | A | CANC |
Clint A Smith
|
|
|
|
General Inspection | 1/23/2012 | 1/23/2012 | 1/23/2012 | | CANC |
Dixie Fellows
|
|
|
sent to clint...this is a large project
|
General Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 11/30/2011 | 11/30/2011 | 11/30/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/26/2011 | 9/26/2011 | 9/28/2011 | | PART |
Tony Young
|
|
|
|
Site Preparation | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | PASS |
Clint A Smith
|
|
|
Walk the project and reviewed the plan with the super.. Told him that the sediment barriers will not work properly due to the location and the installation. Recommended to him to stock them in an area that can be easly accessed on the project and install them when needed. Non stormwater washout will be provided once the demolition work in completed.
|
Site Preparation | 8/1/2011 | 8/9/2011 | 8/9/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 8/1/2011 | 8/1/2011 | 8/1/2011 | | NR |
Steven Webb
|
|
|
No work started, call RP. left message, no call back regarding start date, inserted new site preparation inspection for Aug. 9th.
|