DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/24/201212/24/201212/24/2012 DONE
DetailsClint A Smith
Permit finaled
DOC - Permit Finaled12/24/201212/24/201212/24/2012PPASS
DetailsClint A Smith
General Inspection11/22/201211/22/201211/23/2012 CANC
DetailsKimberly M. Johnson
Holiday
General Inspection10/22/201210/22/201210/22/2012 FAIL
DetailsClint A Smith
Need to stabilize slopes.
General Inspection9/20/20129/20/20129/20/2012 PART
DetailsClint A Smith
Owner is still working on landscaping of the disturbbbed areas. Slopes to the drainage pond are looking go with navite vegitation though.
General Inspection8/20/20128/20/20128/20/2012 PASS
DetailsDaryl Spivey
General Inspection7/19/20127/19/20127/30/2012 PEND
DetailsTony Young
General Inspection6/18/20126/18/20127/2/2012 PART
DetailsTony Young
daily clean up,, correction on overflow on front part of site
General Inspection5/17/20125/17/20125/17/2012 PASS
DetailsClint A Smith
General Inspection4/16/20124/16/20124/16/2012 PASS
DetailsDaryl Spivey
site clean but not vegetated...........ds
BMP Violation3/13/20123/14/20123/14/2012PPART
DetailsClint A Smith
Verbal to RP/homeowner:
Re-install sediment barrier along the toe of slope in the area where no vegitation is established.
General Inspection3/12/20123/12/20123/13/2012PFAIL
DetailsClint A Smith
Message to RP:
Install the sediment barrier below where ACHD has installed the outlet culvert and the cobble rock. Also it is time to look into implimenting perminate stabilization measures. Will follow up on 3/14/2012.
General Inspection2/23/20122/23/20123/2/2012PPASS
DetailsTony Young
General Inspection2/6/20122/6/20122/23/2012 PASS
DetailsTony Young
Complaint Inspection2/15/20122/15/20122/16/2012AFAIL
DetailsClint A Smith
Verbal to RP:
Must install all sediment barriers along the disturbed slopes at the bottom of the drainiage until slope are stabilized.
General Inspection1/6/20121/6/20121/10/2012 PASS
DetailsClint A Smith
General Inspection12/6/201112/6/201112/13/2011 PART
DetailsTony Young
daily work
Conference9/28/20119/29/20119/30/2011PDONE
DetailsClint A Smith
ACHD has diredted the push of fill soil at the outlet pipe of the drainage. Will be also stabilizing it with geotextile fabric with rip rap.
Conference9/28/20119/29/20119/29/2011PPART
DetailsTony Young
Call Clint!! meet at 1:30,, on site with owner and ACHD rep.. owner will work on containment per 460 directive
Complaint Inspection9/27/20119/28/20119/28/2011APART
DetailsTony Young
Call Clint!!,, will meet Clint the 29th,, 1:30
Complaint Inspection9/27/20119/28/20119/28/2011AFAIL
DetailsClint A Smith
Will be having a confrence with the Owner/RP of the property on 9/29/2011PM. We will be going over the drainage and the directive that ACHD has set for the drainage.
Site Preparation8/29/20118/29/20118/30/2011PPART
DetailsTony Young
Bill Phone #: ###-####,, retaining wall and pier footings ok
General Inspection8/18/20118/18/20118/18/2011 PASS
DetailsClint A Smith
BMP Violation7/14/20117/18/20117/18/2011APASS
DetailsClint A Smith
General Inspection7/12/20117/14/20117/14/2011APART
DetailsTony Young

with 460,, conf. on BMPs,, daily clean up,, need to maintain barriers
General Inspection7/12/20117/14/20117/14/2011AFAIL
DetailsClint A Smith
Message to RP:
Remove the sediment that is pushed over the sediment barrier along the drainage pond. Also have the contractors clean up all sediment that has been tracked out onto the sidewalk or the street at the entrance. Also ask RP to contact us over the storm drain outlet pipe that daylighs above the driveway in the hilllside. Will Re-inspect on 7/18/2011am.
Site Preparation7/12/20117/12/20117/12/2011PPASS
DetailsClint A Smith
General Inspection7/7/20117/7/20117/7/2011PPASS
DetailsSteven Webb
Sediment barriers in place upgradient of stormwater pond, Sign posted and stormdrain protected. Question, what is the plan for the daylighted culvert?
BMP Violation6/27/20116/28/20116/28/2011APART
DetailsClint A Smith
Left a message with the RP that he must complete the installation of the gator gaurd sediment barrier by backfilling on the exposed flap.
Complaint Inspection6/27/20116/27/20116/27/2011AFAIL
DetailsClint A Smith
Will notify the complaintee via e-mail.
Verbal notification to RP;
CORRECTION NOTICE:
1. Clean up all sediment and debris on Parkhill at the access.
2. Protect the storm drain inlet on Parkhill.
3. Install a sediment barrier along the perimeter of the drainage pond.
4. Pull back the soil that has been pushed over the slope down towards the drainage pond to the maximum extent practicable.
**Failure to comply will result in a Stop Woprk Order. Will re-inspect on 6/28/2011AM.
General Inspection6/24/20116/27/20116/27/2011AFAIL
DetailsClint A Smith
Verbal notification to RP;
CORRECTION NOTICE:
1. Clean up all sediment and debris on Parkhill at the access.
2. Protect the storm drain inlet on Parkhill.
3. Install a sediment barrier along the perimeter of the drainage pond.
4. Pull back the soil that has been pushed over the slope down towards the drainage pond to the maximum extent practicable.
**Failure to comply will result in a Stop Woprk Order. Will re-inspect on 6/28/2011AM.
Site Preparation6/24/20116/24/20116/24/2011 PART
DetailsClint A Smith
Verbal to RP:
Protect the storm drain at the proposed entrance to the project area. Protect the stock pile next the the drainiage pond if not backfilled by the end of the day. Will follow up on 6/27/2011.
General Inspection10/31/201110/31/2011   
DetailsClint A Smith