Aging Inspection | 7/3/2012 | 7/3/2012 | 7/9/2012 | | DONE |
Jack Frank
|
|
|
|
Site Final | 7/9/2012 | 7/9/2012 | 7/9/2012 | P | PASS |
Jack Frank
|
|
|
all work and landscaping complete
|
Aging Inspection | 5/1/2012 | 5/1/2012 | 5/2/2012 | | CANC |
Clint A Smith
|
|
|
Canceled due to training session.
|
Aging Inspection | 2/29/2012 | 2/29/2012 | 3/2/2012 | | CANC |
Clint A Smith
|
|
|
not at work
|
Site Final | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | NR |
Jim Sly
|
|
|
Dan phone Still landscaping.
|
Random Inspection | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | CANC |
Jim Sly
|
|
|
|
General Inspection | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BMP Violation | 6/27/2011 | 6/28/2011 | 6/29/2011 | P | PASS |
Clint A Smith
|
|
|
D.I??
|
Site Preparation | 6/27/2011 | 6/27/2011 | 6/27/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Protect the storm drain at the corner of Egelmann and Misty Ridge, Will follow up on 6/28/2011PM.
|
Site Preparation | 6/22/2011 | 6/22/2011 | 6/22/2011 | P | FAIL |
Jim Sly
|
|
|
Alan phone......Talked to Alan Need sign and wash out prior to pouring any concrete.
|
Site Preparation | 6/20/2011 | 6/20/2011 | 6/20/2011 | | NR |
Clint A Smith
|
|
|
|
Aging Inspection | 12/27/2011 | 12/27/2011 | | | |
Jim Sly
|
|
|
|
Aging Inspection | 10/27/2011 | 10/27/2011 | | | |
Jim Sly
|
|
|
|