Site Final | 12/7/2011 | 12/7/2011 | 12/7/2011 | A | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 12/7/2011 | 12/7/2011 | 12/7/2011 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 10/26/2011 | 10/27/2011 | 10/28/2011 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 10/14/2011 | 10/14/2011 | 10/21/2011 | | PASS |
Daryl DeGrange
|
|
|
some dirt/mud in street and gutter, General contractor on job site. Said he would get right on clean-up
|
General Inspection | 9/13/2011 | 9/13/2011 | 9/16/2011 | | PART |
Clint A Smith
|
|
|
Message to RP: Clean up and containerize all trash debris that is scattered of the project lot within thr draw at the back of the buildiln lot.
|
General Inspection | 8/12/2011 | 8/12/2011 | 8/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 8/2/2011 | 8/2/2011 | 8/2/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/15/2011 | 7/15/2011 | 7/15/2011 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 7/14/2011 | 7/14/2011 | 7/15/2011 | P | PART |
Tony Young
|
|
|
daily maintanence on the BMPs,, as well as clean up
|
Site Preparation | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PART |
Tony Young
|
|
|
|
Site Preparation | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | PART |
Tony Young
|
|
|
460 notes
|
BMP Violation | 6/27/2011 | 6/28/2011 | 6/28/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/27/2011 | 6/27/2011 | 6/27/2011 | | FAIL |
Clint A Smith
|
|
|
VErbal to RP: Provide additional stakes with the silt fence in between the stakes due to iinstalling the pocketed siltfence with the stakes on the down hill side of the fence. Will allow the alteration of this BMP. Also dig back the area in the drainage behind the siltfence where the sediment has collected and exceed the 50% capacity. Will follow up on 6/28/2011PM.
|