General Inspection | 3/28/2012 | 3/28/2012 | 3/28/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 3/28/2012 | 3/28/2012 | 3/28/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 | | PART |
Clint A Smith
|
|
|
vegitation has not esctablished enough to final out the ESC permit.
|
General Inspection | 2/10/2012 | 2/10/2012 | 2/10/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/26/2012 | 1/26/2012 | 1/27/2012 | | PART |
Steven Webb
|
|
|
Final stablization needed but overall everything looks good.
|
General Inspection | 1/11/2012 | 1/11/2012 | 1/11/2012 | | PART |
Clint A Smith
|
|
|
HAve not achieved final stabilization due to weather conditions.
|
General Inspection | 12/27/2011 | 12/27/2011 | 12/27/2011 | | DONE |
Clint A Smith
|
|
|
No vegitation has been established at this time.
|
General Inspection | 12/7/2011 | 12/7/2011 | 12/7/2011 | | PART |
Clint A Smith
|
|
|
Waiting on vegitation to estabish on all disturbed soil.
|
Site Final | 10/27/2011 | 10/27/2011 | 10/27/2011 | P | NR |
Clint A Smith
|
|
|
Siter has not achieved a uniformed growth over the disturbed soil areas of the project.
|
General Inspection | 10/21/2011 | 10/21/2011 | 10/21/2011 | | PART |
Clint A Smith
|
|
|
Still need to stabilize the lot next to the parking area.
|
General Inspection | 10/6/2011 | 10/6/2011 | 10/7/2011 | | FAIL |
Clint A Smith
|
|
|
Need to initiate stabilization.
|
General Inspection | 9/21/2011 | 9/21/2011 | 9/21/2011 | | PART |
Clint A Smith
|
|
|
Still waiting on stabilization to occur to final permit.
|
Site Final | 9/2/2011 | 9/6/2011 | 9/6/2011 | A | FAIL |
Clint A Smith
|
|
|
leonard Phone #: ###-####
Lefta message for Leonard stating the issues that need to be corrected and completed to achieve a "PASS" on the Site final inspection.
|
General Inspection | 9/1/2011 | 9/1/2011 | 9/2/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/17/2011 | 8/17/2011 | 8/17/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/27/2011 | 8/2/2011 | 8/2/2011 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 7/26/2011 | 7/27/2011 | 7/27/2011 | A | NR |
Clint A Smith
|
|
|
|
General Inspection | 7/26/2011 | 7/26/2011 | 7/26/2011 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 2/27/2012 | 2/27/2012 | | | |
Jim Storey
|
|
|
|