Site Final | 9/10/2012 | 9/10/2012 | 9/10/2012 | A | PASS |
Dixie Fellows
|
|
|
landscaping is complete and bond released
|
General Inspection | 9/10/2012 | 9/10/2012 | 9/10/2012 | | PEND |
Dixie Fellows
|
|
|
i will check on job
|
General Inspection | 7/9/2012 | 7/9/2012 | 7/9/2012 | | PASS |
Daryl DeGrange
|
|
|
|
General Inspection | 5/7/2012 | 5/7/2012 | 5/21/2012 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 3/5/2012 | 3/5/2012 | 3/5/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 1/4/2012 | 1/4/2012 | 1/4/2012 | | PASS |
Dixie Fellows
|
|
|
site is clean...not ready for final yet
|
Random Inspection | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 10/13/2011 | 10/13/2011 | 10/13/2011 | A | PART |
Dave Hannah
|
|
|
|
Random Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 9/26/2011 | 9/26/2011 | 9/26/2011 | | CANC |
Clint A Smith
|
|
|
inspection completed on 8/13/2011
|
Site Preparation | 8/9/2011 | 8/16/2011 | 8/17/2011 | A | PART |
Clint A Smith
|
|
|
Verbal to RP w/CM Company: Post ESC sign where visable from the street.
|
General Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | | NR |
Clint A Smith
|
|
|
|