Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC11-00415
StatusFinaled
Name ERIK MATHIASON
Site Address 3676 E WARM SPRINGS AVE
Project NameBoise Fire Station 15
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/18/20137/18/20137/19/2013 DONE
DetailsClint A Smith
DOC - Permit Finaled7/19/20137/19/20137/19/2013APASS
DetailsClint A Smith
General Inspection6/17/20136/17/20136/17/2013 PART
DetailsClint A Smith
General Inspection5/16/20135/16/20135/17/2013 DONE
DetailsClint A Smith
Will re-inspect in one month
General Inspection4/15/20134/15/20134/23/2013 PART
DetailsClint A Smith
Will re-inspect in a month to see if germination has occured.
General Inspection3/14/20133/14/20133/14/2013 PART
DetailsKimberly M. Johnson
No veg yet
General Inspection2/11/20132/11/20132/11/2013 PART
DetailsEric Strole
Need to still achieve vegitation on areas where they applied a seed, tachifier, and a mulch.
General Inspection1/10/20131/10/20131/10/2013 CANC
DetailsKimberly M. Johnson
canc due to winter storm
General Inspection12/10/201212/10/201212/10/2012 PASS
DetailsClint A Smith
Need to still achieve vegitation on areas where they applied a seed, tachifier, and a mulch.
General Inspection11/8/201211/8/201211/8/2012 PASS
DetailsKimberly M. Johnson
No vegetative growth. Site temporary stabilization still in tact. LM for RP to discuss permanent stabilization options
General Inspection10/8/201210/8/201210/8/2012 PASS
DetailsKimberly M. Johnson
Landscape seeded and mulched. No vegetation yet.
General Inspection9/6/20129/6/20129/10/2012 PASS
DetailsClint A Smith
General Inspection8/6/20128/6/20128/6/2012 PASS
DetailsClint A Smith
General Inspection7/5/20127/5/20127/5/2012 PASS
DetailsClint A Smith
All areas of disturbed soil have had a application of seed, mulch and tachifier applied to temporarly stabilize. If seed takes, then it will be perminately stabilized.
General Inspection6/4/20126/4/20126/4/2012 PASS
DetailsClint A Smith
General Inspection5/3/20125/3/20125/3/2012 PASS
DetailsClint A Smith
General Inspection4/2/20124/2/20124/2/2012 PASS
DetailsClint A Smith
BMP Violation2/28/20122/29/20122/29/2012PPASS
DetailsEric Strole
General Inspection2/24/20122/27/20122/28/2012APART
DetailsEric Strole
spoke with rp and asked to have concrete cleaned up by mixer area.
General Inspection2/24/20122/24/20122/24/2012 CANC
DetailsClint A Smith
Moved to the 27th
BMP Violation1/24/20121/24/20121/24/2012PPART
DetailsEric Strole
morter has been cleaned up and poly liner installed.
BMP Violation1/23/20121/24/20121/24/2012AFAIL
DetailsEric Strole
See notes from clint smith.
BMP Violation1/23/20121/24/20121/24/2012AFAIL
DetailsClint A Smith
Contractor has began cleaning up the residual, but there is a largeamount left to be cleaned up and removed.

Written Final Notice (Given to RP);
1. Clean up all mortar off of the soil around the mixing area.
2. Place the mixers on a poly liner with a perimeter barrier.
3. Install a stabilized construction exit at the back of the court per approved industry standards for access to the back of job.
4. Do not allow access to the back of job through the court until a stabilized construction exit is installed.
5. Clean up all sediment off of the hard surfaces.
**Failure to comply will result in a Stop Work Order. Will re-inspect at the end of the day.
BMP Violation1/20/20121/23/20121/23/2012AFAIL
DetailsClint A Smith
Final Notice:
CLean up all mortar residual surrounding the batch mixers and the washout the containerize or remove from the project. When equipment can access the back section of the project, They must relocate the batch mixers into a contained area that is lined with a 10mil or greater plastic. Also no more vehicle access is allowed to the back portion of the project area until the time being that a stabilized construction exit is install per industry standards.
Will re-inspect on 1/24/2012 am for attempts to achieve compliance.
BMP Violation1/17/20121/20/20121/20/2012ADEFR
DetailsClint A Smith
Moved to 1/23/2012
Complaint Inspection1/17/20121/17/20121/17/2012PFAIL
DetailsClint A Smith
Verbal to RP:
CLean up all residual in the mixing area and provide containment for the mixers and the clean out area. Failure to comply will resilt in further enforcement. will re-inspect on 1/20/2012 AM.
General Inspection1/9/20121/9/20121/9/2012 PASS
DetailsClint A Smith
General Inspection12/7/201112/7/201112/7/2011 PASS
DetailsClint A Smith
General Inspection11/4/201111/4/201111/4/2011 PASS
DetailsEric Strole
General Inspection10/4/201110/4/201110/4/2011 PASS
DetailsClint A Smith
Random Inspection9/1/20119/1/20119/1/2011APASS
DetailsDave Hannah
Random Inspection8/15/20118/15/20118/15/2011APASS
DetailsDave Hannah
Site Preparation8/10/20118/10/20118/10/2011APASS
DetailsDave Hannah
General Inspection8/2/20118/5/20118/8/2011APASS
DetailsClint A Smith
Random Inspection8/5/20118/5/20118/5/2011AFAIL
DetailsJim Storey
Site Preparation8/2/20118/2/20118/2/2011AFAIL
DetailsClint A Smith
Message to RP:
Fill out the yellew ESC sign with all the proper information. Will re-inspect on 8/5/2011am.
Site Preparation8/1/20118/2/20118/2/2011ACANC
DetailsClint A Smith
Duplicate
General Inspection7/4/20117/4/20117/5/2011 CANC
DetailsSteven Webb
holiday