Site Final | 6/12/2012 | 6/13/2012 | 6/13/2012 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 5/28/2012 | 5/28/2012 | 5/28/2012 | | CANC |
Clint A Smith
|
|
|
Holiday
|
General Inspection | 4/26/2012 | 4/26/2012 | 4/26/2012 | | PASS |
Daryl Spivey
|
|
|
|
BMP Violation | 3/23/2012 | 3/26/2012 | 3/26/2012 | P | PASS |
Daryl Spivey
|
|
|
hard surfaces cleaned, silt fence reset and area cleaned up...............ds
|
Random Inspection | 3/23/2012 | 3/23/2012 | 3/23/2012 | P | FAIL |
Eric Strole
|
|
|
Left verbal correction with rp to clean up tracking, gutter pans and all hard surfaces of dirt and debris and maintain silt fence. will reinspect on 3-26-12 pm.
|
General Inspection | 3/5/2012 | 3/5/2012 | 3/12/2012 | | PART |
Tony Young
|
|
|
|
General Inspection | 2/3/2012 | 2/3/2012 | 2/6/2012 | | PART |
Clint A Smith
|
|
|
Clean up all hard surfaces on a daily basis.
|
BMP Violation | 12/30/2011 | 1/3/2012 | 1/5/2012 | A | PART |
Clint A Smith
|
|
|
|
BMP Violation | 12/30/2011 | 12/30/2011 | 12/30/2011 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: Provide additional sediment barriers along the drainage at the end of the silt fence. Also provide a perimeter sediment barrier along the back of sidewalk due to slope being over a 2% grade slope. Will follow up for compliance on 1/3/2011.
|
General Inspection | 12/8/2011 | 12/8/2011 | 12/12/2011 | | PASS |
Daryl Spivey
|
|
|
site clean
|
General Inspection | 10/31/2011 | 10/31/2011 | 11/1/2011 | | PASS |
Daryl Spivey
|
|
|
corrections made...........ds
|
General Inspection | 9/29/2011 | 9/29/2011 | 9/29/2011 | | FAIL |
Daryl Spivey
|
|
|
need trash container and silt fence by stream picked up and set to code...............ds
|
Site Preparation | 8/29/2011 | 8/29/2011 | 8/29/2011 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 8/22/2011 | 8/22/2011 | 8/22/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | | PASS |
Clint A Smith
|
|
|
|