Site Final | 10/10/2011 | 10/10/2011 | 10/10/2011 | P | PASS |
Jim Sly
|
|
|
James phone
|
DOC - Permit Finaled | 10/10/2011 | 10/10/2011 | 10/10/2011 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 9/14/2011 | 9/15/2011 | 9/15/2011 | A | PASS |
Jim Sly
|
|
|
Escobar phone
|
Aging Inspection | 9/9/2011 | 9/9/2011 | 9/14/2011 | | CANC |
Jim Sly
|
|
|
Re-sched.....
|
Site Preparation | 9/14/2011 | 9/14/2011 | 9/14/2011 | P | CANC |
Jim Sly
|
|
|
Re-sched....
|
Site Preparation | 7/1/2011 | 7/1/2011 | 7/1/2011 | | NR |
Jim Johnson
|
|
|
not ready no construction started as of 7/1/11
|