General Inspection | 2/27/2012 | 2/27/2012 | 2/28/2012 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 2/28/2012 | 2/28/2012 | 2/28/2012 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 2/10/2012 | 2/10/2012 | 2/10/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 1/26/2012 | 1/26/2012 | 1/30/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/11/2012 | 1/11/2012 | 1/17/2012 | | PASS |
Tony Young
|
|
|
|
General Inspection | 12/27/2011 | 12/27/2011 | 12/28/2011 | | PASS |
Clint A Smith
|
|
|
Site is Temporarly stabilized.
|
General Inspection | 12/9/2011 | 12/9/2011 | 12/12/2011 | | PASS |
Bill VanDegrift
|
|
|
site has temp. stabilization
|
General Inspection | 11/9/2011 | 11/9/2011 | 11/16/2011 | | PASS |
Tony Young
|
|
|
|
General Inspection | 10/25/2011 | 10/25/2011 | 10/25/2011 | | PASS |
Daryl Spivey
|
|
|
site clean..........ds
|
Random Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | P | PASS |
Daryl DeGrange
|
|
|
Small amount of dirt and gravel in street and gutter, asked contractor to clean it up.
|
General Inspection | 9/22/2011 | 9/22/2011 | 9/22/2011 | | PASS |
Daryl DeGrange
|
|
|
site clean, filters in place
|
General Inspection | 9/6/2011 | 9/6/2011 | 9/8/2011 | | PART |
Clint A Smith
|
|
|
Verbal to contractor: Clean up any tracking from the water truck on a daily basis at the end of rthe day or if it is to excessive.
|
Site Preparation | 8/19/2011 | 8/19/2011 | 8/19/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/7/2011 | 10/7/2011 | | | |
Dixie Fellows
|
|
|
|