Information based on query as of Monday, June 24, 2024.
Permit Information
Permit NumberESC11-00525
StatusFinaled
Name JAYLEN R WALKER
Site Address 3800 S ECKERT RD
Project NameMILL DISTRICT SQUARE
Customer Number 
ePlanReviewNo
Description
Residential Subdivision Site Development-Does not include vertical construction.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final3/10/20163/10/20163/10/2016PPASS
DetailsAndy J. Long
All subdivision work complete. Well over 70% of the total disturbed area is now stabilzed with new residential homes. Brighton Homes to remove remaining DI bags once work is completed on the SFHs. No further ESC inspections necessary on this permit, no outstanding corrections. Permit conditions satisfied.
DOC - Permit Finaled3/10/20163/10/20163/10/2016PPASS
DetailsAndy J. Long
Aging Inspection2/15/20162/15/20162/16/2016 CANC
DetailsAndy J. Long
Aging Inspection12/14/201512/14/201512/14/2015 PART
DetailsAndy J. Long
WIP on SFHs at Mill District Square. BMPs (inlet, protection, concrete washout) are in decent condition.

Due to wet conditions, some minor trackout has occurred on Woodcraft as well as in alley behind homesites on Mill Station. This trackout should be cleaned up as conditions allow and receiving DI bags should be checked for maintenance.

No prohibited discharges or ersosion issues observed.

Aging Inspection10/12/201510/12/201510/12/2015 PASS
DetailsAndy J. Long
WIP by Brighton Homes in Mill District Square on Woodcutter and Mill Station streets. No trackout, sediment runoff, or trash containment issues.

All stormdrains have DI bags that have remaining capacity. These can remain until all SFH construction is complete. Old washout has been moved, new washout installed for new foundations. The lots on westend are ready for excavation soon. No corrections.
Aging Inspection8/10/20158/10/20158/10/2015 PASS
DetailsAndy J. Long
Mill District Square SFHs are in progress. Subdivision BMPs are installed including DI bags and concrete washout. Trash for individual homes contained. RP available for corrections as needed. No corrective actions required at this time. West side of square is still not developed so permit will remain open.
Aging Inspection6/8/20156/8/20156/8/2015 CANC
DetailsEvan Jenkins
BMP Violation4/7/20154/7/20154/7/2015PFAIL
DetailsAndy J. Long
Slurry from concrete cutting/work has left residual dust in the gutter on Woodcarver, no discharges to the MS4 (inlet bag installed)

Request to Brighton homes to require contractors to clean up.
Aging Inspection3/9/20153/9/20153/10/2015 PASS
DetailsAndy J. Long
Mill District Square has about 70% of homes completed. 4 Brighton Homes projects are currently active.

Streets are clean, gutters are free of significant amounts of sediment, and DI bags have remaining capacity. Contractora are using the lined concrete washout that is provided.

No issues with subdivision or individual sites. Subdivision permit covers stockpiles from home excavation being kept on open parcels.

Approved.
Aging Inspection1/5/20151/5/20151/5/2015 PASS
DetailsAndy J. Long
Streets, sidewalks and alleyways in Mill District Square are free of trackout. 4 SFHs with seperate ESC permits in progress currently, contractors staying off mud. Permit, NOI, and SWPPP onsite. Will inform Danial at Brighton to do maintenance on DI bags to remove leaves/sediment when weather improves. Still frozen at this time.
Random Inspection11/5/201411/5/201411/5/2014PPASS
DetailsAndy J. Long
Mill District Square is in compliance after the weekend rain event. No trackout or significant sediment runoff from vacant lots. Perimeter wattles are installed in certain areas. Washout is lined with remain capacity and not intermingling with stormwater runoff. DI bags are installed and do not need maintenance at this time.

Approved.
Random Inspection10/21/201410/21/201410/21/2014APASS
DetailsAndy J. Long
Rainfall inspection of Mill District Square.
Washout contents are staying contained in lined pit and not running off with stormwater. Water flowing into filter bags is visually clear with sediment being trapped at edges of inlet and in silt sack. No trackout or other issues. Site is "weathering" the storm well.
Aging Inspection9/30/20149/30/20149/30/2014 PART
DetailsAndy J. Long
Mill District Square construction is ongoing with open lots/areas being utilized for Brighton Homes operations. The square is about 60% occupied.

Streets are clean, lined washout has adequate capacity, SWPPP and ESC permit on site. The site is in pretty good condition after the weekend rainfall.

Corrections:

1. Replace/fix DI bag on alley in between Sawmill and Eckart.
2. Scoop accumulated sediment & mud at mouths of all DIs in gutters.
3. Josh from Brighton Homes stated he is having a company remove all miscellaneous stockpiles of materials on open lots and will discuss BMPs with stucco crews.

Brighton Homes and Brighton Corp have been verbally notified of the corrections.
Random Inspection7/31/20147/31/20147/31/2014APASS
DetailsAndy J. Long
Mill District Square homes are still under construction. BMPs are in good condition and include lined concrete washout, storm drain drop inlet protection, and good trash containment. No dust or sediment issues. Some open lots have been approved for stockpiling various materials.

No corrections at this time. Permit and SWPPP are on site.
Random Inspection7/11/20147/11/20147/11/2014PPASS
DetailsAndy J. Long
Mill District Square sub is still in progress. Open areas are permited for landscaping and stockpiling needs. DI bags installed and have been recently maintained, washout is lined and has over 70% capacity remaining, streets are clean, permit posted with SWPPP book.

No correctons required.
Random Inspection5/27/20145/27/20145/27/2014PPASS
DetailsAndy J. Long
Streets, sidewalks, and gutters are very clean. DI protection has remaining capacity. Concrete washout in operable condition. 1 violation observed for an individual permit ESC13-01142 - RP was notified of improper stucco washout.
Random Inspection5/13/20145/13/20145/13/2014PPASS
DetailsAndy J. Long
Mill District Square streets and gutters have very little sediment. DI filter bags are in good condition and washout with sufficient capacity.

RP cleaned up a damaged gravel bag per my request while on site.

Site is in compliance
Aging Inspection4/15/20144/15/20144/16/2014 PASS
DetailsAndy J. Long
Mill District Square SFHs still in progress. Concrete washout has recently been cleaned and prepared for more use. Some minor trackout within the square, but none leaving outside. DI's have protections. Bare lots have wattles. Currently in compliance.
Random Inspection2/13/20142/13/20142/13/2014APASS
DetailsAndy J. Long
Syman Company on-site doing maintenance of BMPs. No trackout onto roads from sites. Looks good considering the rain and recent thawing. No corrections at this time.
Aging Inspection1/14/20141/14/20141/14/2014 PASS
DetailsAndy J. Long
Neighborhood BMPs satisfactory. Washout less than 50% capacity and open lots have perimeter wattles. Some track out by Brighton Homes to be addressed. seperately. Sweeping frequency may need to be increased if contractors can't keep dirt on lots.
BMP Violation11/14/201311/15/201311/15/2013APART
DetailsAndy J. Long
Check DI bags, sidewalks and washout conditions

Inspection notes:
Corrections completed:
1. DI bags have been repaired/replaced
2. Sidewalks have been swept (in coordination with Brighton Homes)
3. New washout has been provided.

Not complete:

1. Washout needs lining before use
2. Provide rock entrance to washout pit to prevent trackout.
Complaint Inspection11/14/201311/14/201311/14/2013AFAIL
DetailsAndy J. Long
Corrections required:

1. Replace DI bags that are full ( Woodcarver & Sawmill, Woodcutter and Sawmill - alleyway and corner)
2. Concrete washout is full. Provide new washout or empty. Contain washout water - do not spill on ground.
3. Restrict access to empty lots - evidence of vehicles driving over curbs and mud

Called RP/Brighton inspector Danial Frisby ###-####
Aging Inspection10/21/201310/21/201310/21/2013 PASS
DetailsAndy J. Long
Open lots have perimeter BMPs installed. Drop inlet protection provided on subdivision storm drains. Minimal trackout at time of inspection. Mill station Development still in progress.
Aging Inspection8/19/20138/19/20138/21/2013 PASS
DetailsEric Strole
Aging Inspection6/17/20136/17/20136/17/2013 PASS
DetailsClint A Smith
Aging Inspection4/15/20134/15/20134/15/2013 PASS
DetailsClint A Smith
BMP Violation2/12/20132/15/20132/18/2013APART
DetailsClint A Smith
All areas where runoff had occured, have sediment barriers to prevent turbid runoff onto hard surfaces such as gutter pan.
BMP Violation2/11/20132/12/20132/12/2013APART
DetailsClint A Smith
Sent an Email to the RP(Jaylen Walker) expressing the concerns of area where the disturbed soiol grade still have the potential for run off to occur. Waiting on a response from the RP. will be conducting an inspection on 2/15/2013 for compliance. Correction notice still posted.
BMP Violation2/8/20132/12/20132/12/2013ACANC
DetailsClint A Smith
Duplicate;
BMP Violation2/8/20132/8/20132/11/2013PCANC
DetailsKimberly M. Johnson
Verify all corrective actions identified on 2/6/13 were corrected (could not verify all violations on 2/8 due to snow cover)

Reinspect 2/12
BMP Violation2/6/20132/8/20132/8/2013APART
DetailsKimberly M. Johnson
Could not verify all corrections were completed due to snow cover. Spoke with RP to ask about progress. Will reinspect 2/12
BMP Violation2/6/20132/6/20132/6/2013PFAIL
DetailsClint A Smith
Correction Notice Posted(message to RP)
1.Install sedimentbarrierswhere there is a potential for run off.
2. Repair all rills that have developed due to run off.
3. Clean up all sediment and debris offof the hard surfaces.
4. Maintain all storm drain inlets pretaining to the project.
Will re-inspect on 2/8/2013
Aging Inspection12/24/201212/24/201212/24/2012 PASS
DetailsClint A Smith
BMP Violation10/22/201210/23/201210/23/2012PPASS
DetailsClint A Smith
BMP Violation10/22/201210/22/201210/22/2012AFAIL
DetailsClint A Smith
Correction Notice Posted:(Contacted RP)
1. Clean up all sediment and debris off of the hards surfaces.
2. Protect all storm drains within the interior of the subdivision.
Failure to comply will result in a stop work order. Will re-inspect on 10/23/2012 PM.
Aging Inspection9/24/20129/24/20129/24/2012 FAIL
DetailsClint A Smith
Message to RP:
Maintain all D.I.'s surrounding the project area. CLean up all sediment debris in the gutter pans at the accesses of the project.
BMP Violation7/25/20127/26/20127/26/2012APART
DetailsKimberly M. Johnson
Sediment barrier has been installed along toe of stockpile slopes. Sediment barrier would be more effective if moved back to edge of disturbance (west side of construction site bordering Eckert). Discussed this with RP and it will be corrected. Also discussed with RP the importance of installing wattles/fiber rolls so that they are overlapping with no gaps underneath or between sections. Asked RP to clean sediment and debris around the inlets and the need for daily street sweeping at the entrances
BMP Violation7/23/20127/24/20127/25/2012PFAIL
DetailsClint A Smith
Discussed with the RP over perimeter controls along the stockpile today. Will re-inspect on 7/26/2012.
BMP Violation7/23/20127/23/20127/23/2012AFAIL
DetailsClint A Smith
Verbal message to RPon 7/21/2012:
Install sediment barriers back of sidewalk along Eckert Rd due to slope garade being over 2% and stockpiling of soil also. Wil contact the RP once aagin today and will re-inspect on 7/24/12 PM for installation to be completed.
BMP Violation7/13/20127/16/20127/17/2012AFAIL
DetailsClint A Smith
As Owyhee Construction tried to tap a 1" hole into the 16" water main, the water main split causing a high volume of turbid water from leaving the trenched area in the street and discharge off site into an area that could potentally be "wetlands". We notified Brown Construction sn the RP of the project to contact and notifiy all agencies, "(ACHD, DEQ, US ARMY CORPS and EPA of the discharge..

Since the activity for consrcution project was is ACHD right away and also permitted with ACHD, it is out of the juristiction of Boise City. Will follow up on 6/17/2012 AM for additional ereview of the project area.
Conference7/13/20127/13/20127/13/2012PPART
DetailsClint A Smith
Approved the Dewatering plan that was given. They have designed a detention pond that will hold water through out the dewatering peroid of the constrution project that will include all utility work. The contractor (Brown Construction) will ammend the dewatering plan if the plan that is provided fails. The ammended plan must be resubmitted to the city for approval before any further dewatering activities can occur.
General Inspection7/12/20127/12/20127/13/2012AFAIL
DetailsClint A Smith
Message to RP:
Provide a stabilized construction exit. Post ESC sign where visable from the street. Will folllow up on 7/16/2012
Aging Inspection5/15/20125/15/20125/15/2012 NR
DetailsClint A Smith
No activity.
General Inspection3/15/20123/26/20123/21/2012APASS
DetailsClint A Smith
We ahve granted the extention of the project permit at to the date of 2/1/2013 if site is inactivve. Will be contacted by the RP once a work schedule is generated.
General Inspection3/15/20123/15/20123/15/2012PCANC
DetailsClint A Smith
wrong date.
Site Preparation10/7/20113/15/20123/15/2012APART
DetailsClint A Smith
Waiting on a letter of extention of the permit from Brighton Development. Will follow up in one week.
Aging Inspection2/29/20122/29/20123/2/2012 CANC
DetailsClint A Smith
not at work
Aging Inspection12/28/201112/28/201112/28/2011 DONE
DetailsClint A Smith
No activity has occurred since permit was issued.
Aging Inspection10/7/201110/7/201110/7/2011 NR
DetailsClint A Smith
Will begin in March of 2012.
Site Preparation8/2/20118/8/20118/8/2011ANR
DetailsClint A Smith
General Inspection8/2/20118/2/20118/2/2011 NR
DetailsClint A Smith
Placed a call in with RP to inform when the project will begin.