Site Final | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Andy J. Long
|
|
|
All subdivision work complete. Well over 70% of the total disturbed area is now stabilzed with new residential homes. Brighton Homes to remove remaining DI bags once work is completed on the SFHs. No further ESC inspections necessary on this permit, no outstanding corrections. Permit conditions satisfied.
|
DOC - Permit Finaled | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 2/15/2016 | 2/15/2016 | 2/16/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 12/14/2015 | 12/14/2015 | 12/14/2015 | | PART |
Andy J. Long
|
|
|
WIP on SFHs at Mill District Square. BMPs (inlet, protection, concrete washout) are in decent condition.
Due to wet conditions, some minor trackout has occurred on Woodcraft as well as in alley behind homesites on Mill Station. This trackout should be cleaned up as conditions allow and receiving DI bags should be checked for maintenance.
No prohibited discharges or ersosion issues observed.
|
Aging Inspection | 10/12/2015 | 10/12/2015 | 10/12/2015 | | PASS |
Andy J. Long
|
|
|
WIP by Brighton Homes in Mill District Square on Woodcutter and Mill Station streets. No trackout, sediment runoff, or trash containment issues.
All stormdrains have DI bags that have remaining capacity. These can remain until all SFH construction is complete. Old washout has been moved, new washout installed for new foundations. The lots on westend are ready for excavation soon. No corrections.
|
Aging Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 | | PASS |
Andy J. Long
|
|
|
Mill District Square SFHs are in progress. Subdivision BMPs are installed including DI bags and concrete washout. Trash for individual homes contained. RP available for corrections as needed. No corrective actions required at this time. West side of square is still not developed so permit will remain open.
|
Aging Inspection | 6/8/2015 | 6/8/2015 | 6/8/2015 | | CANC |
Evan Jenkins
|
|
|
|
BMP Violation | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | FAIL |
Andy J. Long
|
|
|
Slurry from concrete cutting/work has left residual dust in the gutter on Woodcarver, no discharges to the MS4 (inlet bag installed)
Request to Brighton homes to require contractors to clean up.
|
Aging Inspection | 3/9/2015 | 3/9/2015 | 3/10/2015 | | PASS |
Andy J. Long
|
|
|
Mill District Square has about 70% of homes completed. 4 Brighton Homes projects are currently active.
Streets are clean, gutters are free of significant amounts of sediment, and DI bags have remaining capacity. Contractora are using the lined concrete washout that is provided.
No issues with subdivision or individual sites. Subdivision permit covers stockpiles from home excavation being kept on open parcels.
Approved.
|
Aging Inspection | 1/5/2015 | 1/5/2015 | 1/5/2015 | | PASS |
Andy J. Long
|
|
|
Streets, sidewalks and alleyways in Mill District Square are free of trackout. 4 SFHs with seperate ESC permits in progress currently, contractors staying off mud. Permit, NOI, and SWPPP onsite. Will inform Danial at Brighton to do maintenance on DI bags to remove leaves/sediment when weather improves. Still frozen at this time.
|
Random Inspection | 11/5/2014 | 11/5/2014 | 11/5/2014 | P | PASS |
Andy J. Long
|
|
|
Mill District Square is in compliance after the weekend rain event. No trackout or significant sediment runoff from vacant lots. Perimeter wattles are installed in certain areas. Washout is lined with remain capacity and not intermingling with stormwater runoff. DI bags are installed and do not need maintenance at this time.
Approved.
|
Random Inspection | 10/21/2014 | 10/21/2014 | 10/21/2014 | A | PASS |
Andy J. Long
|
|
|
Rainfall inspection of Mill District Square. Washout contents are staying contained in lined pit and not running off with stormwater. Water flowing into filter bags is visually clear with sediment being trapped at edges of inlet and in silt sack. No trackout or other issues. Site is "weathering" the storm well.
|
Aging Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 | | PART |
Andy J. Long
|
|
|
Mill District Square construction is ongoing with open lots/areas being utilized for Brighton Homes operations. The square is about 60% occupied.
Streets are clean, lined washout has adequate capacity, SWPPP and ESC permit on site. The site is in pretty good condition after the weekend rainfall.
Corrections:
1. Replace/fix DI bag on alley in between Sawmill and Eckart. 2. Scoop accumulated sediment & mud at mouths of all DIs in gutters. 3. Josh from Brighton Homes stated he is having a company remove all miscellaneous stockpiles of materials on open lots and will discuss BMPs with stucco crews.
Brighton Homes and Brighton Corp have been verbally notified of the corrections.
|
Random Inspection | 7/31/2014 | 7/31/2014 | 7/31/2014 | A | PASS |
Andy J. Long
|
|
|
Mill District Square homes are still under construction. BMPs are in good condition and include lined concrete washout, storm drain drop inlet protection, and good trash containment. No dust or sediment issues. Some open lots have been approved for stockpiling various materials.
No corrections at this time. Permit and SWPPP are on site.
|
Random Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Andy J. Long
|
|
|
Mill District Square sub is still in progress. Open areas are permited for landscaping and stockpiling needs. DI bags installed and have been recently maintained, washout is lined and has over 70% capacity remaining, streets are clean, permit posted with SWPPP book.
No correctons required.
|
Random Inspection | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PASS |
Andy J. Long
|
|
|
Streets, sidewalks, and gutters are very clean. DI protection has remaining capacity. Concrete washout in operable condition. 1 violation observed for an individual permit ESC13-01142 - RP was notified of improper stucco washout.
|
Random Inspection | 5/13/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Andy J. Long
|
|
|
Mill District Square streets and gutters have very little sediment. DI filter bags are in good condition and washout with sufficient capacity.
RP cleaned up a damaged gravel bag per my request while on site.
Site is in compliance
|
Aging Inspection | 4/15/2014 | 4/15/2014 | 4/16/2014 | | PASS |
Andy J. Long
|
|
|
Mill District Square SFHs still in progress. Concrete washout has recently been cleaned and prepared for more use. Some minor trackout within the square, but none leaving outside. DI's have protections. Bare lots have wattles. Currently in compliance.
|
Random Inspection | 2/13/2014 | 2/13/2014 | 2/13/2014 | A | PASS |
Andy J. Long
|
|
|
Syman Company on-site doing maintenance of BMPs. No trackout onto roads from sites. Looks good considering the rain and recent thawing. No corrections at this time.
|
Aging Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 | | PASS |
Andy J. Long
|
|
|
Neighborhood BMPs satisfactory. Washout less than 50% capacity and open lots have perimeter wattles. Some track out by Brighton Homes to be addressed. seperately. Sweeping frequency may need to be increased if contractors can't keep dirt on lots.
|
BMP Violation | 11/14/2013 | 11/15/2013 | 11/15/2013 | A | PART |
Andy J. Long
|
|
|
Check DI bags, sidewalks and washout conditions
Inspection notes: Corrections completed: 1. DI bags have been repaired/replaced 2. Sidewalks have been swept (in coordination with Brighton Homes) 3. New washout has been provided.
Not complete:
1. Washout needs lining before use 2. Provide rock entrance to washout pit to prevent trackout.
|
Complaint Inspection | 11/14/2013 | 11/14/2013 | 11/14/2013 | A | FAIL |
Andy J. Long
|
|
|
Corrections required:
1. Replace DI bags that are full ( Woodcarver & Sawmill, Woodcutter and Sawmill - alleyway and corner) 2. Concrete washout is full. Provide new washout or empty. Contain washout water - do not spill on ground. 3. Restrict access to empty lots - evidence of vehicles driving over curbs and mud
Called RP/Brighton inspector Danial Frisby ###-####
|
Aging Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 | | PASS |
Andy J. Long
|
|
|
Open lots have perimeter BMPs installed. Drop inlet protection provided on subdivision storm drains. Minimal trackout at time of inspection. Mill station Development still in progress.
|
Aging Inspection | 8/19/2013 | 8/19/2013 | 8/21/2013 | | PASS |
Eric Strole
|
|
|
|
Aging Inspection | 6/17/2013 | 6/17/2013 | 6/17/2013 | | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 4/15/2013 | 4/15/2013 | 4/15/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 2/12/2013 | 2/15/2013 | 2/18/2013 | A | PART |
Clint A Smith
|
|
|
All areas where runoff had occured, have sediment barriers to prevent turbid runoff onto hard surfaces such as gutter pan.
|
BMP Violation | 2/11/2013 | 2/12/2013 | 2/12/2013 | A | PART |
Clint A Smith
|
|
|
Sent an Email to the RP(Jaylen Walker) expressing the concerns of area where the disturbed soiol grade still have the potential for run off to occur. Waiting on a response from the RP. will be conducting an inspection on 2/15/2013 for compliance. Correction notice still posted.
|
BMP Violation | 2/8/2013 | 2/12/2013 | 2/12/2013 | A | CANC |
Clint A Smith
|
|
|
Duplicate;
|
BMP Violation | 2/8/2013 | 2/8/2013 | 2/11/2013 | P | CANC |
Kimberly M. Johnson
|
|
|
Verify all corrective actions identified on 2/6/13 were corrected (could not verify all violations on 2/8 due to snow cover)
Reinspect 2/12
|
BMP Violation | 2/6/2013 | 2/8/2013 | 2/8/2013 | A | PART |
Kimberly M. Johnson
|
|
|
Could not verify all corrections were completed due to snow cover. Spoke with RP to ask about progress. Will reinspect 2/12
|
BMP Violation | 2/6/2013 | 2/6/2013 | 2/6/2013 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice Posted(message to RP) 1.Install sedimentbarrierswhere there is a potential for run off. 2. Repair all rills that have developed due to run off. 3. Clean up all sediment and debris offof the hard surfaces. 4. Maintain all storm drain inlets pretaining to the project. Will re-inspect on 2/8/2013
|
Aging Inspection | 12/24/2012 | 12/24/2012 | 12/24/2012 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 10/22/2012 | 10/23/2012 | 10/23/2012 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 10/22/2012 | 10/22/2012 | 10/22/2012 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice Posted:(Contacted RP) 1. Clean up all sediment and debris off of the hards surfaces. 2. Protect all storm drains within the interior of the subdivision. Failure to comply will result in a stop work order. Will re-inspect on 10/23/2012 PM.
|
Aging Inspection | 9/24/2012 | 9/24/2012 | 9/24/2012 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Maintain all D.I.'s surrounding the project area. CLean up all sediment debris in the gutter pans at the accesses of the project.
|
BMP Violation | 7/25/2012 | 7/26/2012 | 7/26/2012 | A | PART |
Kimberly M. Johnson
|
|
|
Sediment barrier has been installed along toe of stockpile slopes. Sediment barrier would be more effective if moved back to edge of disturbance (west side of construction site bordering Eckert). Discussed this with RP and it will be corrected. Also discussed with RP the importance of installing wattles/fiber rolls so that they are overlapping with no gaps underneath or between sections. Asked RP to clean sediment and debris around the inlets and the need for daily street sweeping at the entrances
|
BMP Violation | 7/23/2012 | 7/24/2012 | 7/25/2012 | P | FAIL |
Clint A Smith
|
|
|
Discussed with the RP over perimeter controls along the stockpile today. Will re-inspect on 7/26/2012.
|
BMP Violation | 7/23/2012 | 7/23/2012 | 7/23/2012 | A | FAIL |
Clint A Smith
|
|
|
Verbal message to RPon 7/21/2012: Install sediment barriers back of sidewalk along Eckert Rd due to slope garade being over 2% and stockpiling of soil also. Wil contact the RP once aagin today and will re-inspect on 7/24/12 PM for installation to be completed.
|
BMP Violation | 7/13/2012 | 7/16/2012 | 7/17/2012 | A | FAIL |
Clint A Smith
|
|
|
As Owyhee Construction tried to tap a 1" hole into the 16" water main, the water main split causing a high volume of turbid water from leaving the trenched area in the street and discharge off site into an area that could potentally be "wetlands". We notified Brown Construction sn the RP of the project to contact and notifiy all agencies, "(ACHD, DEQ, US ARMY CORPS and EPA of the discharge..
Since the activity for consrcution project was is ACHD right away and also permitted with ACHD, it is out of the juristiction of Boise City. Will follow up on 6/17/2012 AM for additional ereview of the project area.
|
Conference | 7/13/2012 | 7/13/2012 | 7/13/2012 | P | PART |
Clint A Smith
|
|
|
Approved the Dewatering plan that was given. They have designed a detention pond that will hold water through out the dewatering peroid of the constrution project that will include all utility work. The contractor (Brown Construction) will ammend the dewatering plan if the plan that is provided fails. The ammended plan must be resubmitted to the city for approval before any further dewatering activities can occur.
|
General Inspection | 7/12/2012 | 7/12/2012 | 7/13/2012 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: Provide a stabilized construction exit. Post ESC sign where visable from the street. Will folllow up on 7/16/2012
|
Aging Inspection | 5/15/2012 | 5/15/2012 | 5/15/2012 | | NR |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 3/15/2012 | 3/26/2012 | 3/21/2012 | A | PASS |
Clint A Smith
|
|
|
We ahve granted the extention of the project permit at to the date of 2/1/2013 if site is inactivve. Will be contacted by the RP once a work schedule is generated.
|
General Inspection | 3/15/2012 | 3/15/2012 | 3/15/2012 | P | CANC |
Clint A Smith
|
|
|
wrong date.
|
Site Preparation | 10/7/2011 | 3/15/2012 | 3/15/2012 | A | PART |
Clint A Smith
|
|
|
Waiting on a letter of extention of the permit from Brighton Development. Will follow up in one week.
|
Aging Inspection | 2/29/2012 | 2/29/2012 | 3/2/2012 | | CANC |
Clint A Smith
|
|
|
not at work
|
Aging Inspection | 12/28/2011 | 12/28/2011 | 12/28/2011 | | DONE |
Clint A Smith
|
|
|
No activity has occurred since permit was issued.
|
Aging Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 | | NR |
Clint A Smith
|
|
|
Will begin in March of 2012.
|
Site Preparation | 8/2/2011 | 8/8/2011 | 8/8/2011 | A | NR |
Clint A Smith
|
|
|
|
General Inspection | 8/2/2011 | 8/2/2011 | 8/2/2011 | | NR |
Clint A Smith
|
|
|
Placed a call in with RP to inform when the project will begin.
|