Site Final | 9/17/2012 | 9/17/2012 | 9/17/2012 | A | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 9/17/2012 | 9/17/2012 | 9/17/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/16/2012 | 8/16/2012 | 8/16/2012 | | PASS |
Clint A Smith
|
|
|
Work seems to be completed but the BLD is still in the issued status.
|
General Inspection | 7/16/2012 | 7/16/2012 | 7/16/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 6/14/2012 | 6/14/2012 | 6/18/2012 | | PASS |
Tony Young
|
|
|
|
General Inspection | 5/14/2012 | 5/14/2012 | 5/16/2012 | | PASS |
Daryl DeGrange
|
|
|
site clean, landscaping all in
|
General Inspection | 4/12/2012 | 4/12/2012 | 4/12/2012 | | PASS |
Dixie Fellows
|
|
|
they are finishing up the job...site is clean
|
General Inspection | 3/12/2012 | 3/12/2012 | 3/19/2012 | | PASS |
Dixie Fellows
|
|
|
went to job and noticed a little sand sliding under the waddles at bottom of hill..talked to g/c and he will fix it today
|
General Inspection | 2/9/2012 | 2/9/2012 | 2/9/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 1/9/2012 | 1/9/2012 | 1/9/2012 | | PASS |
Daryl DeGrange
|
|
|
job still under construction,silt barriers in place, site clean
|
General Inspection | 12/9/2011 | 12/9/2011 | 12/9/2011 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 10/17/2011 | 10/17/2011 | 10/19/2011 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 9/15/2011 | 9/15/2011 | 9/16/2011 | | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 8/12/2011 | 8/15/2011 | 8/15/2011 | A | CANC |
Steven Webb
|
|
|
bob Phone #: ###-####: Site preparation inspection performed on 8/8/11 and inspection passed. Inspection performed by inspector #460.
|
Site Preparation | 8/8/2011 | 8/8/2011 | 8/8/2011 | | PASS |
Clint A Smith
|
|
|
|