Permit Information
Permit NumberESC11-00627
StatusFinaled
Name RANDY REUTZEL
Site Address 3400 E WARM SPRINGS AVE
Project NameDALLAS HARRIS ESTATES SUB #7
Customer Number 
ePlanReviewNo
Description
SUB DIVISION
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection1/4/20131/4/20131/4/2013 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled1/4/20131/4/20131/4/2013PPASS
DetailsClint A Smith
General Inspection12/20/201212/20/201212/20/2012 PASS
DetailsClint A Smith
General Inspection12/5/201212/5/201212/5/2012 DONE
DetailsClint A Smith
Vertical construction has begun on many of the lot but not all.
General Inspection11/20/201211/20/201211/20/2012 PART
DetailsClint A Smith
Mostly active in vertical construction.
General Inspection11/5/201211/5/201211/5/2012 FAIL
DetailsClint A Smith
All disturbed area must be stabilized if inactive for more than 14 days.
General Inspection10/19/201210/19/201210/19/2012 PASS
DetailsClint A Smith
General Inspection10/4/201210/4/201210/4/2012 PART
DetailsClint A Smith
NO activity.
General Inspection9/19/20129/19/20129/19/2012 PART
DetailsClint A Smith
No activity today.
General Inspection9/4/20129/4/20129/5/2012 PASS
DetailsClint A Smith
Starting to complete this phase, and begin phase 8&9.
General Inspection8/17/20128/17/20128/17/2012 PASS
DetailsClint A Smith
General Inspection8/2/20128/2/20128/2/2012 PASS
DetailsClint A Smith
General Inspection7/18/20127/18/20127/18/2012 PASS
DetailsClint A Smith
General Inspection7/3/20127/3/20127/3/2012 PASS
DetailsClint A Smith
General Inspection6/18/20126/18/20126/18/2012 PASS
DetailsClint A Smith
General Inspection6/1/20126/1/20126/1/2012 PART
DetailsClint A Smith
Need to clean up tracked materials on a daily basis.
General Inspection5/17/20125/17/20125/17/2012 PART
DetailsClint A Smith
Working in the rigt a way and dewatering into the burrow ditch. ACHD approved the method. Contractor is responsible for cleaning up all tracked materail though out the day.
General Inspection5/2/20125/2/20125/3/2012 PASS
DetailsClint A Smith
General Inspection4/17/20124/17/20124/18/2012 PASS
DetailsClint A Smith
Tracking Control3/30/20124/2/20124/2/2012APART
DetailsClint A Smith
Need to clean up the minimal tracking on atleast on a daily basis.
General Inspection3/29/20123/29/20123/30/2012 FAIL
DetailsClint A Smith
Verbal to RP:
Due to saturated conditions try to keep vehicle traffic on and off the hard surface to a minimum. Clean up all tracked out material off of the hard surfaces. MAintain all construction accesses off of the project area. Will follow up on 4/2/3012
General Inspection3/14/20123/14/20123/14/2012 PASS
DetailsClint A Smith
No activity today due to showers.
General Inspection2/28/20122/28/20122/28/2012 PASS
DetailsEric Strole
General Inspection2/13/20122/13/20122/13/2012 PASS
DetailsClint A Smith
General Inspection1/27/20121/27/20121/27/2012 PART
DetailsClint A Smith
Contractor is actively trying to clean site and install additional sediment BMP's.
General Inspection1/12/20121/12/20121/12/2012 DONE
DetailsClint A Smith
Permit finaled.
General Inspection12/28/201112/28/201112/28/2011 PASS
DetailsClint A Smith
General Inspection10/27/201110/27/201110/31/2011 PASS
DetailsClint A Smith
General Inspection10/12/201110/12/201110/12/2011 PASS
DetailsClint A Smith
General Inspection9/27/20119/27/20119/27/2011 PASS
DetailsDave Hannah
Site Preparation9/9/20119/9/20119/9/2011 PASS
DetailsClint A Smith