Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC11-00678
StatusFinaled
Name JAYLEN R WALKER
Site Address 5284 N FARROW ST
Project NameTHE HICKORIES EAST NO. 2
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled6/24/20136/24/20136/24/2013PPASS
DetailsKimberly M. Johnson
Clint Finaled 4/22/2013
General Inspection5/23/20135/23/20135/23/2013 PASS
DetailsClint A Smith
General Inspection4/22/20134/22/20134/22/2013 DONE
DetailsClint A Smith
Permit finaled
General Inspection3/21/20133/21/20133/21/2013 CANC
DetailsClint A Smith
General Inspection2/18/20132/18/20132/19/2013 CANC
DetailsKimberly M. Johnson
Holiday
General Inspection1/17/20131/17/20131/17/2013 PART
DetailsClint A Smith
Most of the area is under vertical construction. Will not final out the permit until all area is built out and stabilized.
General Inspection12/17/201212/17/201212/17/2012 PASS
DetailsClint A Smith
General Inspection11/15/201211/15/201211/15/2012 PART
DetailsClint A Smith
site is under vertical construction but not all area have become active.
General Inspection10/15/201210/15/201210/15/2012 PART
DetailsKimberly M. Johnson
Concrete washout at max capacity. Do not use until emptied. Carefull of potential trackout today because of the moisture. Note: conference scheduled with RP to review status of all sites for 10/24/12
General Inspection9/13/20129/13/20129/13/2012 PART
DetailsClint A Smith
Site is not completely vertical construction.
General Inspection8/13/20128/13/20128/13/2012 PASS
DetailsClint A Smith
General Inspection7/12/20127/12/20127/13/2012 PASS
DetailsClint A Smith
General Inspection6/11/20126/11/20126/11/2012 CANC
DetailsAlan Hauser
General Inspection5/10/20125/10/20125/10/2012 NR
DetailsClint A Smith
General Inspection3/8/20123/8/20123/13/2012 NR
DetailsJim Sly
General Inspection2/6/20122/6/20122/6/2012 CANC
DetailsAlan Hauser
General Inspection1/6/20121/6/20121/6/2012 NR
DetailsClint A Smith
General Inspection4/9/20124/9/2012   
DetailsJim Sly
General Inspection11/1/201111/1/2011   
DetailsJim Sly
Site Preparation9/30/20119/30/2011   
DetailsJim Sly