Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC11-00681
StatusFinaled
Name JERRY GRIFFIN
Site Address 2686 E WINDSONG DR
Project NameBoulder hieghts
Customer Number 
ePlanReviewNo
Description
Single family home
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection1/24/20131/24/20131/28/2013 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled1/28/20131/28/20131/28/2013PPASS
DetailsClint A Smith
General Inspection12/24/201212/24/201212/24/2012 PASS
DetailsClint A Smith
General Inspection11/22/201211/22/201211/23/2012 CANC
DetailsKimberly M. Johnson
Holiday
General Inspection10/22/201210/22/201210/23/2012 PART
DetailsClint A Smith
Waiting on final srtabilization.
General Inspection9/20/20129/20/20129/21/2012 PART
DetailsClint A Smith
Left a message for the RP to contact me to discuss over all landscape requirments on the areas were sod was not installed.
General Inspection8/20/20128/20/20128/21/2012 PASS
DetailsClint A Smith
BMP Violation7/16/20127/18/20127/20/2012APASS
DetailsClint A Smith
In the process of exacavating out driveway and final grading of all slopes.
General Inspection7/16/20127/16/20127/16/2012 FAIL
DetailsClint A Smith
Message to RP (David Bowman):
Provide a sediment barrier at the bottom of the proposed driveway until the time where the constrution of the access reaches partial stabilized with compacted pit run. Also next to the mail box, extend the silt fence to protect from any sediment disposition from occuring from the disturbed slope above. Will follow up on 7/18/2012
General Inspection6/14/20126/14/20126/19/2012 PASS
DetailsDave Hannah
BMP Violation5/11/20125/14/20125/15/2012APART
DetailsClint A Smith
Explained to RP that he is responsible for maintaining all BMP's and making sure any sediment leaving he project area and deposits on hard surfaces must be cleaned up by the end of the work day .
Stop Work Order5/8/20125/8/20125/11/2012AFAIL
DetailsClint A Smith
On 5/82012 a stop work ored was posted on the project for the listed violations:
1. Clean up all sediment and debris off of all the hard surfaces.
2. Clean up all tracked sediment and maintain the construction exit.
3. Protect the storm drain at the intersection at the court.
4. MAintain and add additional sediment barriers or initiate stabilization practices on all slopes to prevnt additional rilling.
Random Inspection5/11/20125/11/20125/11/2012APART
DetailsClint A Smith
Verbal to RP:
Backfill the installed silt fence and clean up the remain sediment deposits off of the hard surfaces. If work is not complete by the end of the day, a STOP WORK ORDER will be posted. Will re-inspect on 5/15/2012am.
BMP Violation5/8/20125/8/20125/8/2012AFAIL
DetailsClint A Smith
Refer to stop work order inspection.
General Inspection4/17/20124/17/20124/17/2012PPASS
DetailsDave Hannah
BMP Violation4/5/20124/9/20124/9/2012APASS
DetailsClint A Smith
BMP Violation4/5/20124/5/20124/5/2012PFAIL
DetailsClint A Smith
2nd and final Correction Notice:
Verbal to RP (David B.)
1. Install sit fence per approved industry standards.
2. Install a sediment barrier along the back of sidewalk at the front of driveway access.
3. Maintain storm drain inlet protection to the west of court access.
4. Clean up and remove all sediment and debris out of the gutterpan.
*Failure to comply with the all correction listed on the given notice will ressult in a STOP WORK ORDER. Will re-inspect on 4/9/2012 AM.
BMP Violation4/4/20124/5/20124/5/2012APEND
DetailsDixie Fellows
met eric at job
BMP Violation4/4/20124/4/20124/4/2012PCANC
DetailsEric Strole
per 460 changed to 4-5-12 am
General Inspection4/4/20124/4/20124/4/2012PCANC
DetailsEric Strole
BMP Violation4/2/20124/3/20124/4/2012PFAIL
DetailsEric Strole
some corrections complete, needs to finish construction entrance and sediment barriers and finish cleaning all dirt and debric off all hard surfaces.
General Inspection4/2/20124/2/20124/2/2012 FAIL
DetailsEric Strole
Left verbal correction with rp and left correction notice to clean up all dirt and debris off all hard surfaces(gutter pans-sidewalks-street) maintain all sediment barriers, maintain construction entrance or block off and post esc sign. Needs to be complete by 4-3-12 am. Failure to comply will result in a stop work order. Will reinspect on 4-3-12 pm.
General Inspection2/23/20122/23/20123/1/2012 CANC
DetailsDave Hannah
BMP Violation2/28/20122/29/20123/1/2012PPART
DetailsEric Strole
bmp's in place,will recheck gutter pans and hard surfaces next time at site.
BMP Violation2/23/20122/24/20122/28/2012PFAIL
DetailsEric Strole
no corrections have been completed from last inspection, left correction notice and voice mail on phone of both rp's listed to comply by 2 29 12 am. will reinspect 2-29-12 pm.
Random Inspection2/23/20122/23/20122/23/2012AFAIL
DetailsClint A Smith
Message to RP:
CLean up all sediment and debris off of sidewalks and what has collected behind the gravel bags within the gutterpan. Also maitain or replace the sediment barriers within the court of windsong ct. Will re-inspect on 2/24/2012PM
BMP Violation1/20/20121/23/20121/23/2012APART
DetailsClint A Smith
Contractor install perventitive measures. And cleanedup all of the sediment and debris from the hard surfaces.
General Inspection1/20/20121/20/20121/20/2012PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment off of all hardsurfaces from the discharge that were influenced from the 1.6 inch of precipetation within the last 36 hours. Maijntain and add additional bmps on all of the slope area of the project. Repair the gully that has formed at the front the project with the culdisac. Will follow on 1/23/2012am.
General Inspection1/6/20121/6/20121/6/2012 PASS
DetailsClint A Smith
Complaint Inspection12/5/201112/5/201112/5/2011APART
DetailsClint A Smith
Verbal to RP:
Per the ESCplan, must provide a dust surpression on all disturbed soil to miniumize any fugativedust. Informed code enforcement of my actions.
Random Inspection11/10/201111/10/201111/10/2011PPASS
DetailsTom Arcoraci
General Inspection11/7/201111/7/201111/7/2011APASS
DetailsDave Hannah
Site Preparation10/21/201110/21/201110/24/2011 PART
DetailsClint A Smith
Verbal to RP:
It is not allowed to keep the gravel bags within the gutterpan.