General Inspection | 6/7/2012 | 6/7/2012 | 6/7/2012 | | PART |
Clint A Smith
|
|
|
Waiting on vegitation to establish.
|
DOC - Permit Finaled | 6/7/2012 | 6/7/2012 | 6/7/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/23/2012 | 5/23/2012 | 5/24/2012 | | PART |
Clint A Smith
|
|
|
Waiting on final stabilization measures to be implimented.
|
General Inspection | 5/8/2012 | 5/8/2012 | 5/10/2012 | | PART |
Clint A Smith
|
|
|
Need to finish up landscaping going onto the greenbelt.
|
General Inspection | 4/5/2012 | 4/5/2012 | 4/5/2012 | | DONE |
Clint A Smith
|
|
|
No activity in the staging area where Parks and Rec are using for the maintenance area.
|
General Inspection | 3/21/2012 | 3/21/2012 | 3/27/2012 | | PART |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 3/1/2012 | 3/6/2012 | 3/6/2012 | A | PART |
Clint A Smith
|
|
|
Need to stabilized all disturbed soil where portions of the project is complete or in active for 14 days or greated.
|
General Inspection | 2/28/2012 | 2/28/2012 | 3/1/2012 | | PEND |
Dixie Fellows
|
|
|
this is that huge job on the river..i rescheduled this to clint as he knows the job
|
General Inspection | 2/10/2012 | 2/10/2012 | 2/16/2012 | | PART |
Clint A Smith
|
|
|
Access and staging area are still active. No track out has occured.
|
General Inspection | 1/26/2012 | 1/26/2012 | 1/26/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Maintain the construction exit. Is not constructed of a federal approved method.
|
General Inspection | 1/10/2012 | 1/11/2012 | 1/11/2012 | A | FAIL |
Clint A Smith
|
|
|
Must maintain the project entrance.
|
General Inspection | 1/10/2012 | 1/10/2012 | 1/10/2012 | | CANC |
Clint A Smith
|
|
|
Moved until 1/11/2012
|
General Inspection | 11/30/2011 | 11/30/2011 | 12/1/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP and GC: Maintain the construction exit. Inspect and maintain all BMP's within the total project area.
|
General Inspection | 10/28/2011 | 10/28/2011 | 10/28/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: After the breeching of the river to Quinns Pond, must re-establish and add additional stabilizing to the inlet and outlet channels. Must follow practices that are industry standards. Gave the conciderastion options of using bent rebar at a length of 24inchs minimum to secure the geotextile fabric to the channel slopes.
Also informed the RP, contractor and city of Boise that since there was a turbid discharge into the Boise River occurred, that per the requirements of the 2008 current CGP they must notify EPA of the discharge and document into the SWPPP log. The discharge occurred on 10/25/2011 around 12pm.
Other concerns of the wattles have been removed along the Green belt.
|
General Inspection | 10/18/2011 | 10/18/2011 | 10/18/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Re-install sediment barrier along the green belt that runs west. Also pay attenion to the river bank due to the disturbed soil along the river bank. May need to install a sediment barrier at the bottom of bank to minumize soil from dislodging during percipetation.
|
General Inspection | 4/20/2012 | 4/20/2012 | | | |
Clint A Smith
|
|
|
|