Permit Information
Permit NumberESC11-00732
StatusFinaled
Name JIM CONGER
Site Address 3006 S WISE WAY
Project NameHarris Ranch
Customer Number 
ePlanReviewNo
Description
Harris Rach Greenbelt Re-Alignment
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection1/31/20141/31/20141/31/2014 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled1/31/20141/31/20141/31/2014PPASS
DetailsAndy J. Long
Greenbelt realignment is complete and shoulders stabilized. Some remaining area of disturbance will be stabilized under the ESC permit for the Barber trunk - as discussed with Boise PW contact Mike Shepard. No further ESC inspections required for this project.
General Inspection1/16/20141/16/20141/16/2014 PASS
DetailsAndy J. Long
No acitivity. No change in status. Will keep open to monitor area for time being.
General Inspection1/1/20141/1/20141/2/2014 CANC
DetailsEvan Jenkins
holiday
General Inspection12/17/201312/17/201312/17/2013 PASS
DetailsAndy J. Long
No activtity. Will consider Final at next inspection. BMPs remaining in place while stabilization occurs could be covered by Boise Parks & Rec ESC permit possibly.
General Inspection12/2/201312/2/201312/2/2013 PASS
DetailsAndy J. Long
No changes at site. No new activity.
General Inspection11/15/201311/15/201311/15/2013 PASS
DetailsAndy J. Long
CGP 2008 permit issued in 2011 is now expired and was not found in CGP 2012 eNOI database. Permit # ID10CP57

Greenbelt realignment is complete, no further construction activity at this time. Some bank areas are in process of vegetation/stabilization.

Will walk through on next inspection; no corrections at this time.
General Inspection10/31/201310/31/201310/31/2013 PASS
DetailsAndy J. Long
No construction activity. Greenbelt has been realigned and vegetation is stabilizing banks. May want to close out permit.
General Inspection10/16/201310/16/201310/16/2013 PASS
DetailsEvan Jenkins
Vegetation close to re-established
General Inspection10/1/201310/1/201310/2/2013 PASS
DetailsEric Strole
General Inspection9/16/20139/16/20139/17/2013 CANC
DetailsEric Strole
General Inspection8/30/20138/30/20138/30/2013 PASS
DetailsEric Strole
General Inspection8/15/20138/15/20138/20/2013 PASS
DetailsDave Hannah
General Inspection7/31/20137/31/20137/31/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/16/20137/16/20137/17/2013 PASS
DetailsClint A Smith
General Inspection7/1/20137/1/20137/1/2013 PASS
DetailsClint A Smith
General Inspection6/14/20136/14/20136/14/2013 PART
DetailsClint A Smith
Future activity will begin soon
General Inspection5/30/20135/30/20136/6/2013 FAIL
DetailsClint A Smith
Message to RP;
Remove all BMPS along the greenbelt where final stabilization has been achieved. Waiting on a response from the RP.
General Inspection5/15/20135/15/20135/15/2013 DONE
DetailsClint A Smith
NO activity
General Inspection4/30/20134/30/20134/30/2013 PART
DetailsClint A Smith
NO acytivity at this time.
General Inspection4/12/20134/12/20134/15/2013 PART
DetailsClint A Smith
In the near future they will be start add in additional fill within the overflow basins.
General Inspection3/28/20133/28/20133/28/2013 PART
DetailsClint A Smith
Will be working on the overflow onds in the near future.
BMP Violation3/8/20133/13/20133/18/2013ACANC
DetailsClint A Smith
could not reach RP
General Inspection3/8/20133/8/20133/8/2013 FAIL
DetailsClint A Smith
Verbal to RP on 3/6/2013 to remove all silt fence along all of the green belt. Will follow up on 3/13/2013
General Inspection2/21/20132/21/20132/21/2013 PART
DetailsClint A Smith
No activity
General Inspection2/6/20132/6/20132/6/2013 DONE
DetailsClint A Smith
NO activity.
General Inspection1/22/20131/22/20131/22/2013 DONE
DetailsClint A Smith
No activity.
General Inspection1/7/20131/7/20131/7/2013 PART
DetailsClint A Smith
No activity
General Inspection12/21/201212/21/201212/21/2012 PART
DetailsClint A Smith
Still using for stockpiling of pit run.
General Inspection12/6/201212/6/201212/6/2012 DONE
DetailsClint A Smith
No activity.
General Inspection11/21/201211/21/201211/21/2012 PART
DetailsClint A Smith
No activity
General Inspection11/6/201211/6/201211/6/2012 DONE
DetailsClint A Smith
No activity.
General Inspection10/19/201210/19/201210/19/2012 PASS
DetailsClint A Smith
General Inspection10/4/201210/4/201210/4/2012 PART
DetailsClint A Smith
No activity
General Inspection9/19/20129/19/20129/19/2012 PART
DetailsClint A Smith
No activity
General Inspection9/4/20129/4/20129/4/2012 PART
DetailsClint A Smith
working with parks and Rec on rilling issues on the spillway between the two ponds.
General Inspection8/20/20128/20/20128/20/2012 PART
DetailsClint A Smith
Discussed with RP over status of the stock pile areas. Here in a few weeks they will be submitting for the permit for phase 10 of the developement. At this time the stock pile area has activity occuring keeping the project in an "active" status.
General Inspection8/3/20128/3/20128/3/2012 PART
DetailsClint A Smith
Site inactive but perminate and temporary stabilization method have been conducted. Site in good conditions.
General Inspection7/19/20127/19/20127/19/2012 PASS
DetailsClint A Smith
No activity at this time.
General Inspection7/4/20127/4/20127/4/2012 CANC
DetailsClint A Smith
Holiday
General Inspection6/19/20126/19/20126/19/2012 PASS
DetailsClint A Smith
General Inspection6/4/20126/4/20126/4/2012 PASS
DetailsDave Hannah
General Inspection5/18/20125/18/20125/18/2012 PASS
DetailsClint A Smith
Slope have been stabilized.
General Inspection5/3/20125/3/20125/3/2012 NR
DetailsDave Hannah
General Inspection4/18/20124/18/20124/20/2012 PASS
DetailsEric Strole
General Inspection4/3/20124/3/20124/3/2012 PASS
DetailsClint A Smith
BMP Violation3/15/20123/19/20123/20/2012APASS
DetailsClint A Smith
Conference3/15/20123/15/20123/15/2012PFAIL
DetailsClint A Smith
Verbal to RP:
Replace all top soil that eroded from the sheeting across the green belt into the Wise way corridor and remove all sediment deposits form the event that discharged into the wetland area.
Also gave thee option to the RP to plug off the three outlets from the pond that outfall into the Wallings corridor to eliminate a turbid discharge. Will follow up on
Complaint Inspection3/13/20123/13/20123/13/2012PFAIL
DetailsClint A Smith
Verbal to RP;
Stop all activities. Only allowed to correctthe discharge over the greenbelt into the Wallings corridor that has generated a turbid discharge and created rilling throught the recently placed top soil. Will be meeting with the RP on corrective actions that are occuring at this time and ost discharge structures today or on 3/14/2012.
General Inspection2/29/20122/29/20122/29/2012 PASS
DetailsEric Strole
General Inspection2/14/20122/14/20122/14/2012 PASS
DetailsEric Strole
hydroseeding application applied last week.
BMP Violation1/27/20121/27/20121/27/2012PPART
DetailsClint A Smith
Have initiated sediiment traps and check dams within areas of flow. Additional sediment barriers have been installed and a reinstalled the sediment barriers in the areas where maintenance was needed.
General Inspection1/26/20121/26/20121/27/2012 FAIL
DetailsClint A Smith
Verbal to RP:
Maintain ALL SEDIMENT CONTROL BMP's though out the project area. Recommended to the RP also that he should install rock check dams and sediment traps in all areas where there are culvert inlet , outlets and flow channels. As soon as possible stabilize all slopes and stock piles (if not active) of the project. Will follow up on 1/27/2012 PM to review the measure that are being installed.
General Inspection1/11/20121/11/20121/11/2012 PASS
DetailsClint A Smith
BMP Violation11/9/201111/14/201111/14/2011APART
DetailsClint A Smith
Grade is sloped back into the project area.
General Inspection11/9/201111/9/201111/9/2011 FAIL
DetailsClint A Smith
Verbal to RP:
Provide sediment barriers along the project perimeter next to the intake station where grading has occur to the river bank. Also re-install sediment barriers whaere they have been removed to perform utility work. Will re-inspect on 11/14/2011
Conference10/20/201110/21/201110/21/2011ADONE
DetailsClint A Smith
All BMP's inplace and will be paving by end of Nov. 2011
Site Preparation10/21/201110/21/201110/21/2011PPASS
DetailsClint A Smith
All BMP's inplace and will be paving by end of Nov. 2011
Site Preparation10/20/201110/20/201110/20/2011 NR
DetailsClint A Smith
Will have a pre-construction meeting on 10/21/2011