General Inspection | 10/14/2013 | 10/14/2013 | 10/14/2013 | | PASS |
Evan Jenkins
|
|
|
See Final
|
DOC - Permit Finaled | 10/14/2013 | 10/14/2013 | 10/14/2013 | P | PASS |
Evan Jenkins
|
|
|
Construction appears to be complete. All other permits are Finaled
|
General Inspection | 9/12/2013 | 9/12/2013 | 9/13/2013 | | PASS |
Bill VanDegrift
|
|
|
|
General Inspection | 8/12/2013 | 8/12/2013 | 8/12/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 7/11/2013 | 7/11/2013 | 7/11/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 6/10/2013 | 6/10/2013 | 6/11/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 5/9/2013 | 5/9/2013 | 5/10/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 4/8/2013 | 4/8/2013 | 4/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 3/7/2013 | 3/7/2013 | 3/7/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 2/4/2013 | 2/4/2013 | 2/5/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 1/3/2013 | 1/3/2013 | 1/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 12/3/2012 | 12/3/2012 | 12/3/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 11/1/2012 | 11/1/2012 | 11/1/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 10/1/2012 | 10/1/2012 | 10/1/2012 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | PASS |
Kimberly M. Johnson
|
|
|
|
Complaint Inspection | 8/30/2012 | 8/30/2012 | 8/30/2012 | A | FAIL |
Kimberly M. Johnson
|
|
|
Received complaint that concrete washout occurred onto a tree located on Idaho St. Upon investigation, City Inspector confirmed complaint and contacted RP for immediate clean up. RP to contact City Inspector when he arrives on site to initiate clean up actions. No work will be allowed to continue until corrective actions are complete. Will re-inspect same day 8/30
|
Conference | 8/30/2012 | 8/30/2012 | 8/30/2012 | A | DONE |
Kimberly M. Johnson
|
|
|
Met with Toby of RSCI to review violations and required clean up actions.
|
General Inspection | 8/23/2012 | 8/23/2012 | 8/23/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 7/23/2012 | 7/23/2012 | 7/26/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 6/19/2012 | 6/20/2012 | 6/21/2012 | A | PASS |
Clint A Smith
|
|
|
All sediment and debris have been removed from the hard surfaces.
|
General Inspection | 6/18/2012 | 6/18/2012 | 6/19/2012 | | FAIL |
Clint A Smith
|
|
|
E-mail to RP: CLean up any sedimentor residuals in the street and gutter pan around the trash containers on Main St. Will re-inspect on 6/20/2012
|
General Inspection | 5/18/2012 | 5/18/2012 | 5/18/2012 | | PART |
Clint A Smith
|
|
|
Must lean up spillage from the washout affter every pour date.
|
General Inspection | 4/17/2012 | 4/17/2012 | 4/18/2012 | | PART |
Clint A Smith
|
|
|
Have pulled storm drain inlet protection in a portion of the basement whare all construction activities are complete.
|
General Inspection | 3/16/2012 | 3/16/2012 | 3/16/2012 | | PART |
Clint A Smith
|
|
|
Explained to city engineer and the RP to keep up and maintain the concrete washout area when needed.
|
General Inspection | 2/14/2012 | 2/14/2012 | 2/14/2012 | | PASS |
Clint A Smith
|
|
|
Up keep is being performed well.
|
General Inspection | 1/11/2012 | 1/11/2012 | 1/11/2012 | | PART |
Clint A Smith
|
|
|
Working with the erosion control sub contractor on storm drain inlet protection. Due to the odd size, the contractor has made alterarions on the installation methods.
|