Permit Information
Permit NumberESC11-00816
StatusFinaled
Name CHAD OLSEN
Site Address 1811 S TOLUKA WAY
Project NameSingle family home HILLSIDE
Customer Number 
ePlanReviewNo
Description
HILLSIDE
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BMP Violation7/24/20127/31/20127/31/2012APASS
DetailsClint A Smith
Have applieda two step application to all disturded slopes and have applied one step on the larger area.
Site Final7/27/20127/27/20127/27/2012PPASS
DetailsDave Hannah
DOC - Permit Finaled7/27/20127/27/20127/27/2012PPASS
DetailsDave Hannah
Conference7/24/20127/24/20127/24/2012PFAIL
DetailsClint A Smith
After the developer has regraded the property slopes to a 2 to 1 slope he must at a minimum stabilize the additional disaturbed area with a tachifier and relocate the sediment controls to the lower section of the disturbed area installed per instustry/ manufacture specifications. Will follow up on schedule on 7/31/2012
General Inspection6/28/20126/28/20126/29/2012 PASS
DetailsClint A Smith
General Inspection5/28/20125/28/20125/28/2012 CANC
DetailsClint A Smith
Holiday
General Inspection4/26/20124/26/20125/3/2012 PASS
DetailsDave Hannah
General Inspection3/26/20123/26/20123/28/2012 PASS
DetailsDaryl DeGrange
still under construction
Random Inspection2/23/20122/23/20122/23/2012APART
DetailsClint A Smith
Verbal to RP:
Have contractors on a daily basis clean up all sediment and debris off of all hard surfaces. Will follow up in the future.
BMP Violation2/17/20122/21/20122/21/2012APART
DetailsClint A Smith
Minor amounts of sediment need to be cleaned up and removed out of the gutter pan.
BMP Violation2/17/20122/17/20122/17/2012AFAIL
DetailsClint A Smith
Verbal to RP:
CLeean up all hard surfaces of all sediment and debris. Provide a sediment barrier along back of sidewalk where stockpiles run along the bcak of it. Will follow up on 2/21/2012 AM for compliance.
BMP Violation2/9/20122/9/20122/9/2012APART
DetailsClint A Smith
CLeanup has occured. Spoke to the RP and explained to them that it must cleaned up on a daily basis.
Complaint Inspection2/8/2012 2/8/2012PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment off of the hard surfaces. Provide a trash container for all trash debris. Prior to the next forecasted storm event must providea sediment abrrier along the back of side where the stockpile a located. Will re-inspect on 2/9/2011AM.
General Inspection1/20/20121/23/20121/23/2012ACANC
DetailsClint A Smith
General Inspection1/19/20121/20/20121/20/2012PPART
DetailsClint A Smith
Verbal to RP:
Provide perimeter controls at the back of property along the perimeter. Post ESC sign where it is visable from the street. Will follow up on 1/23/2012AM.
General Inspection1/12/20121/12/20121/12/2012 NR
DetailsEric Strole
no activity at this time.