General Inspection | 6/19/2012 | 6/19/2012 | 6/19/2012 | | DONE |
Clint A Smith
|
|
|
Permit Finaled.
|
DOC - Permit Finaled | 6/19/2012 | 6/19/2012 | 6/19/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/18/2012 | 5/18/2012 | 5/18/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 4/17/2012 | 4/17/2012 | 4/17/2012 | | PASS |
Dixie Fellows
|
|
|
i went by the job and the front yard is complete...i called dave about the back yard and he said the home owner is doing it..he will call and get a time line from them
|
BMP Violation | 3/13/2012 | 3/13/2012 | 3/15/2012 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 3/12/2012 | 3/12/2012 | 3/13/2012 | P | PART |
Tony Young
|
|
|
need to clean up work in progress
|
General Inspection | 2/29/2012 | 2/29/2012 | 3/1/2012 | | PASS |
Dixie Fellows
|
|
|
wip...site is being kept clean
|
General Inspection | 1/27/2012 | 1/27/2012 | 1/30/2012 | P | PART |
Tony Young
|
|
|
will clean debris soon
|
BMP Violation | 12/30/2011 | 1/3/2012 | 1/3/2012 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 12/30/2011 | 12/30/2011 | 12/30/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment tracked off of lot from the concrete pours occuring today. Maintain the sediment barriera installed on the front perimeter of the lot. Make sure there is a concrete washout and it is being utilized. Will follow up for compliance on 1/3/2011.
|
Site Preparation | 12/9/2011 | 12/9/2011 | 12/9/2011 | P | NR |
Tony Young
|
|
|
|