Site Final | 9/20/2012 | 10/1/2012 | 10/1/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/20/2012 | 9/20/2012 | 9/20/2012 | | PART |
Clint A Smith
|
|
|
Notified the RP to remove all temporary BMP's to final out the permit. Will be notified by the RP at the time of completion.
|
General Inspection | 8/20/2012 | 8/20/2012 | 8/21/2012 | | PASS |
Clint A Smith
|
|
|
site
|
General Inspection | 7/20/2012 | 7/20/2012 | 7/20/2012 | | PART |
Clint A Smith
|
|
|
Perimeter controls in good condition. Waiting on verticla construction to begin.
|
General Inspection | 6/19/2012 | 6/19/2012 | 6/19/2012 | | PART |
Clint A Smith
|
|
|
HAve not achieved stabilization requirements to final out the permit.
|
General Inspection | 5/18/2012 | 5/18/2012 | 5/18/2012 | | PART |
Clint A Smith
|
|
|
Site has not achieved a uniform growth of vegitation.
|
General Inspection | 4/17/2012 | 4/17/2012 | 4/17/2012 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 3/16/2012 | 3/16/2012 | 3/16/2012 | | DONE |
Clint A Smith
|
|
|
No ativity and all slope have intitiated stabilization measures on all slopes.
|
General Inspection | 2/14/2012 | 2/14/2012 | 2/15/2012 | | PART |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 1/13/2012 | 1/13/2012 | 1/13/2012 | | PART |
Clint A Smith
|
|
|
Sitwe in active to May of 2012. Sloe have been temporarly stabilized with a hydrolic application of mulch, and tachifier blend. Other tempory bmps will stay inplace until the time of vertical constuction.
|
Site Preparation | 11/25/2011 | 11/25/2011 | 11/25/2011 | | PASS |
Clint A Smith
|
|
|
|