Site Final | 5/16/2012 | 5/16/2012 | 5/16/2012 | A | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 3/19/2012 | 3/20/2012 | 3/20/2012 | A | PASS |
Eric Strole
|
|
|
|
BMP Violation | 3/16/2012 | 3/19/2012 | 3/19/2012 | P | FAIL |
Eric Strole
|
|
|
still not correct, talked with rp at washout and needs to be complete by 3-20-12 am or a stop work on all concrete pouring will be issued ontill violation is complete. will reinspect on 3-20-12 pm.
|
BMP Violation | 3/15/2012 | 3/16/2012 | 3/16/2012 | P | FAIL |
Eric Strole
|
|
|
rp to have ready by 3-19-12 am. slill not lined.will reinspect 3-19-12 pm
|
Random Inspection | 3/15/2012 | 3/15/2012 | 3/15/2012 | A | FAIL |
Eric Strole
|
|
|
left verbal correction with rp to correct installation of concrete washout pit. will reinspect on 2-16-12 pm.
|
Site Preparation | 2/17/2012 | 2/17/2012 | 2/17/2012 | P | PASS |
Jim Sly
|
|
|
Rollo phone
|
Site Preparation | 2/13/2012 | 2/13/2012 | 2/13/2012 | | NR |
Eric Strole
|
|
|
Not ready at this time, no activity.
|