Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC12-00077
StatusFinaled
Name JAYLEN R WALKER
Site Address 6250 E WARM SPRINGS AVE
Project NameRIVERHEIGHTS SUB #2
Customer Number 
ePlanReviewNo
Description
NO VERTICAL CONSTRUCTION
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/14/201311/14/201311/14/2013 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled11/14/201311/14/201311/14/2013PPASS
DetailsAndy J. Long
Brighton Corp has issued NOT for the development on it CGP. Greater than 70% stabilization, all lots occupied/stabilized. As noted, this permit is for phase #3, not 2 (seperate permit already finaled). No further ESC inspections required.
General Inspection10/30/201310/30/201310/30/2013 PART
DetailsAndy J. Long
Subdivision is complete with all lots occupied. One remaining DI bag on the corner of Globe Theatre and Grand Prairie needs to be removed.
General Inspection10/14/201310/14/201310/15/2013 PASS
DetailsAndy J. Long
Subdivision is finished and is inside developed portion of River Heights.
Site Final10/14/201310/15/201310/15/2013APART
DetailsEvan Jenkins
Daniel-actually sub #3 Phone #: ###-####
3 Home Properties still need Re-vegetated. Concrete washout areas need to be removed along with garbage piles prior to officially Signing Off on the project. EJ 794.3958
General Inspection9/27/20139/27/20139/27/2013 PASS
DetailsEvan Jenkins
General Inspection9/12/20139/12/20139/13/2013 CANC
DetailsBill VanDegrift
General Inspection8/28/20138/28/20138/29/2013 PASS
DetailsBill VanDegrift
General Inspection8/13/20138/13/20138/13/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/29/20137/29/20137/29/2013 PASS
DetailsKimberly M. Johnson
General Inspection7/12/20137/12/20137/12/2013 PASS
DetailsClint A Smith
General Inspection6/27/20136/27/20136/27/2013 PASS
DetailsClint A Smith
General Inspection6/12/20136/12/20136/12/2013 CANC
DetailsKimberly M. Johnson
General Inspection5/28/20135/28/20135/28/2013 PASS
DetailsKimberly M. Johnson
General Inspection5/13/20135/13/20135/13/2013 PASS
DetailsClint A Smith
General Inspection4/26/20134/26/20134/26/2013 PASS
DetailsClint A Smith
General Inspection4/11/20134/11/20134/11/2013 PASS
DetailsClint A Smith
Partial Stop Work Order3/27/20133/27/20133/27/2013ADONE
DetailsKimberly M. Johnson
Work exceeding scope. Stop work on pen canal crossing and staging/stockpiling located east of phase 2
General Inspection3/26/20133/26/20133/26/2013 FAIL
DetailsClint A Smith
Per KMJ, work has begun on the new phase of River hieghts without permitting being approved.

Verbal to RP Braxton(building);
Clean up all tracked sediment off of the disturbed soil where stock piling of bark and gravel is located behind the concrete washout. Will re-inspect on 3/29/2013.
General Inspection3/11/20133/11/20133/11/2013 PASS
DetailsClint A Smith
General Inspection2/22/20132/22/20132/22/2013 PASS
DetailsClint A Smith
General Inspection2/7/20132/7/20132/7/2013 PART
DetailsClint A Smith
Starting to install sediment barriers along portions of the disturbed area where run off has occured or has the potential to occur.
General Inspection1/23/20131/23/20131/23/2013 PART
DetailsClint A Smith
General Inspection1/8/20131/8/20131/8/2013 PASS
DetailsClint A Smith
General Inspection12/21/201212/21/201212/21/2012 PASS
DetailsClint A Smith
General Inspection12/6/201212/6/201212/6/2012 PASS
DetailsClint A Smith
General Inspection11/21/201211/21/201211/21/2012 PASS
DetailsClint A Smith
General Inspection11/6/201211/6/201211/6/2012APASS
DetailsKimberly M. Johnson
RP called to notify City that stabilization has been performed in the inactive portions of the site. Verified during site inspection.
Conference10/11/201210/24/201210/24/2012PDONE
DetailsKimberly M. Johnson
Discussed stabilization requirements. RP to submit an updated schedule for construction/stabilization showing where construction is complete, where construction is active, and where construction will begin in the next month, 5 month, 7 month and 9 month periods
General Inspection10/11/201210/11/201210/11/2012 FAIL
DetailsKimberly M. Johnson
Discussed construction schedule with RP and stabilization requirement. RP stated that a native grass seed mixture was broadcasted over disturbed areas and will send me the date when he confirms. RP will email schedule for the anticipated start date of construction for each lot. Requested schedule by 10/18. Discussed drainage patterns and runoff risk of the subdividision. Set up on-site conference to discuss concerns for 10/24/12. Correction notice issued. Requested construction schedule for active contstruction on the vacant lots and/or stabilization schedule for vacant lots. Concrete washout needs maintenance.
General Inspection9/26/20129/26/20129/26/2012 FAIL
DetailsClint A Smith
Still areas of the development are still not stabilized with either temporary or perminate stabilization practices. Have expressed my concern to the RP multiple times over federal requirements.
General Inspection9/11/20129/11/20129/11/2012 PART
DetailsClint A Smith
Still area of in activity on large potios of the sub division. Have relayed the the requirement per the 2012 CGP over stabilization of all disturbed soil due to inactivity for more than 14 day. I have been told that vertical construction will be occuring soon but has not yet. I explained to him that he is still responsible for stabilization though.
General Inspection8/24/20128/24/20128/24/2012 FAIL
DetailsClint A Smith
Many of vacant lot have not been stabilized since the completion of the land development phase. the time has exceeded the 14 day period of the EPA requirements. Will discuss with upper management over the violation for corrective actions needed.
General Inspection8/9/20128/9/20128/9/2012 PART
DetailsClint A Smith
Becoming active with vertical construction.
General Inspection7/25/20127/25/20127/25/2012 PASS
DetailsClint A Smith
General Inspection7/10/20127/10/20127/11/2012 PASS
DetailsClint A Smith
General Inspection6/22/20126/22/20126/22/2012 PASS
DetailsClint A Smith
General Inspection6/6/20126/6/20126/7/2012 PASS
DetailsClint A Smith
General Inspection5/22/20125/22/20125/22/2012 FAIL
DetailsClint A Smith
Verbal message to RP:
Protect all storm drain inlets through out the project area. Will follow up on 5/23/2012PM.
General Inspection5/3/20125/3/20125/3/2012 PASS
DetailsClint A Smith
General Inspection4/18/20124/18/20124/19/2012 PART
DetailsClint A Smith
Need to estabish a stabilized construction exit.
General Inspection4/2/20124/2/20124/3/2012 PASS
DetailsClint A Smith
General Inspection3/16/20123/16/20123/16/2012 PASS
DetailsClint A Smith
General Inspection3/1/20123/1/20123/2/2012 CANC
DetailsClint A Smith
not at work
General Inspection2/14/20122/14/20123/1/2012 PASS
DetailsDave Hannah