General Inspection | 11/7/2013 | 11/7/2013 | 11/7/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes.
|
DOC - Permit Finaled | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | PASS |
Andy J. Long
|
|
|
Subdivision development is complete. Vertical construction of SFDs ongoing with individual ESC permits. The CGP for this subdivision project has been Terminated through the EPA's eNOI system (permit# IDR12B458_2012-12-28). No further ESC inspections required.
|
General Inspection | 10/23/2013 | 10/23/2013 | 10/23/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | PEND |
Evan Jenkins
|
|
|
Contractor to repair silt fence and maintain construction Entrance
|
General Inspection | 9/19/2013 | 9/19/2013 | 9/23/2013 | | CANC |
Eric Strole
|
|
|
|
General Inspection | 8/20/2013 | 8/20/2013 | 8/27/2013 | | CANC |
Bob Archibald
|
|
|
|
General Inspection | 9/4/2013 | 9/4/2013 | | | |
Kimberly M. Johnson
|
|
|
|
General Inspection | 6/4/2013 | 6/4/2013 | | A | |
Clint A Smith
|
|
|
Clint, call me about this one -kmj
|