General Inspection | 10/30/2012 | 10/30/2012 | 10/30/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 10/30/2012 | 10/30/2012 | 10/30/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/14/2012 | 9/14/2012 | 9/14/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Must stabilize the the lot next to the project.
|
Random Inspection | 7/30/2012 | 7/30/2012 | 7/30/2012 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 7/24/2012 | 7/24/2012 | 7/24/2012 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 7/20/2012 | 7/20/2012 | 7/20/2012 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 6/13/2012 | 6/13/2012 | 6/14/2012 | | CANC |
Alan Hauser
|
|
|
|
Site Preparation | 4/23/2012 | 4/23/2012 | 4/30/2012 | | CANC |
Clint A Smith
|
|
|
Completed by 450
|
BMP Violation | 4/25/2012 | 4/25/2012 | 4/25/2012 | P | PART |
Mike Jordan
|
|
|
Work is in progress on corrections.
|
Site Preparation | 4/24/2012 | 4/24/2012 | 4/24/2012 | P | PART |
Mike Jordan
|
|
|
Needs to post ESC permit sign, provide drain inlet protection at west parking lot, provide BMP at east property line and concrete washout. Verbal correction notice to RP.
|