Aging Inspection | 8/24/2012 | 8/24/2012 | 8/24/2012 | | DONE |
Clint A Smith
|
|
|
Permmit finaled.
|
DOC - Permit Finaled | 8/24/2012 | 8/24/2012 | 8/24/2012 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 5/3/2012 | 5/4/2012 | 5/8/2012 | A | PART |
Clint A Smith
|
|
|
Notice removed. All issues corrected. Left a message with the RP to instruct the sub contractors to clean up on a daily basis of all trash debris, sediment tracked off of the disturbed areas and other material types on the hard surfaces.
|
BMP Violation | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | FAIL |
Eric Strole
|
|
|
Left verbal and written correction notice with rp to clean up all stucco piles by mixer and maintain stucco washout and clean up all gutter pans.If not complete by days end a stop work will be issued. Will reinspect on 5-4 -12 am.
|
Random Inspection | 5/2/2012 | 5/2/2012 | 5/2/2012 | A | FAIL |
Eric Strole
|
|
|
Left verbal correction with rp to protect and maintain all di boxes on site and clean up all dirt and debris off all hard surfaces and gutter pans and clean up all stucco by mixer and maintain washout for stucco. needs to be complete by days end. will reinspect on 5-3-12 am.
|
Site Preparation | 4/25/2012 | 4/25/2012 | 4/25/2012 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 4/20/2012 | 4/20/2012 | 4/20/2012 | | PART |
Clint A Smith
|
|
|
CLean up on a daily basis.
|