DOC - Permit Finaled | | | 6/19/2013 | | PASS |
|
|
|
|
General Inspection | 5/6/2013 | 5/6/2013 | 5/6/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/19/2013 | 3/19/2013 | 3/19/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
LM for RP I was onsite for inspection; Conference with Mike gave verbal: sweep gutters; gater gaurd not installed correctly; trash; maintain washout; maintain material storage prior to next rain (scheduled tonight); entrance used on adjacent lot on south side must either have clean rock installed or stop using it.
|
General Inspection | 2/8/2013 | 2/8/2013 | 2/12/2013 | | DONE |
Clint A Smith
|
|
|
Please refer to ESC12-00067 for compliance inspections.
|
General Inspection | 12/24/2012 | 12/24/2012 | 12/24/2012 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 11/7/2012 | 11/7/2012 | 11/8/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Maintain concrete washout located in the north section of the project. Containerize all trash debris thourgh out the project area. Will follow up on 11/9/2012. Please refer to ESC12-00067 for the folloup inspection.
|
Random Inspection | 9/18/2012 | 9/18/2012 | 9/18/2012 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 8/27/2012 | 8/27/2012 | 8/28/2012 | | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | PART |
Mike Jordan
|
|
|
Still needs to post BMP permit signs.
|