DOC - Permit Finaled | | | 6/19/2013 | | |
|
|
|
|
General Inspection | 4/30/2013 | 4/30/2013 | 4/30/2013 | | PART |
Clint A Smith
|
|
|
Clean up hard surfaces from the landscape activities
|
General Inspection | 3/15/2013 | 3/15/2013 | 3/19/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
LM for RP that I was onsite conducting inspection and met with Mike to give verbal: Gater gaurd not trenched; clean trash; washout needs maintenance; sweep gutter; material storage needs maintenance prior to next rain event (forecasted tonight); construction entrance on south side needs installed with letter from land owner to use property or fence closed up so it's not used.
|
General Inspection | 1/28/2013 | 1/28/2013 | 1/28/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to new PM (Mike J. McHargue) Update the RP information with the valid RP.
|
Site Preparation | 12/13/2012 | 12/13/2012 | 12/13/2012 | | NR |
Clint A Smith
|
|
|
Have not begun to construct the carports.
|