General Inspection | 4/30/2013 | 4/30/2013 | 4/30/2013 | | DONE |
Clint A Smith
|
|
|
'Permit finaled.
|
DOC - Permit Finaled | 4/30/2013 | 4/30/2013 | 4/30/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/15/2013 | 3/15/2013 | 3/19/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
LM for RP I was onsite for inspection; Conference with Mike gave verbal: sweep gutters; gater gaurd not installed correctly; trash; maintain washout; maintain material storage prior to next rain (scheduled tonight); entrance used on adjacent lot on south side must either have clean rock installed or stop using it.
|
General Inspection | 1/28/2013 | 1/28/2013 | 1/28/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to new PM (Mike J. McHargue) Update the RP information with the valid RP.
|
Site Preparation | 12/13/2012 | 12/13/2012 | 12/13/2012 | | NR |
Clint A Smith
|
|
|
Have not begun to construct the carports.
|