Site Final | 6/14/2012 | 6/14/2012 | 6/14/2012 | P | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 6/14/2012 | 6/14/2012 | 6/14/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/18/2012 | 5/18/2012 | 5/18/2012 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/17/2012 | 5/17/2012 | 5/17/2012 | A | PASS |
Jim Storey
|
|
|
interior only
|
Random Inspection | 5/16/2012 | 5/16/2012 | 5/16/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/16/2012 | 5/16/2012 | 5/16/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/10/2012 | 5/10/2012 | 5/10/2012 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 4/27/2012 | 5/2/2012 | 5/2/2012 | A | PASS |
Eric Strole
|
|
|
check for plastic washout liner
|
BMP Violation | 4/26/2012 | 4/27/2012 | 4/27/2012 | A | PART |
Bill VanDegrift
|
|
|
See history site looks good but there isn't a plastic washout liner in place, RP siad excavator would install one when he returns in a few days
|
Random Inspection | 4/26/2012 | 4/26/2012 | 4/26/2012 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 4/26/2012 | 4/26/2012 | 4/26/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up tracking going to the concrete washout. Provide a washout with a plastic lining. Will re-inspect on 4/27/2012
|