Site Final | 8/17/2012 | 8/17/2012 | 8/17/2012 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 8/17/2012 | 8/17/2012 | 8/17/2012 | P | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 7/18/2012 | 7/20/2012 | 7/23/2012 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/16/2012 | 7/17/2012 | 7/18/2012 | P | FAIL |
Clint A Smith
|
|
|
Vebal Correction Notice : Clean up all resiual from washout next to house not into a washout sealed containment. Provide portable sealed washout containers for activities that include non storm water washing of tools and materals. Will re-inspect on 7/20/2012
|
BMP Violation | 7/16/2012 | 7/16/2012 | 7/16/2012 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up the washed residual washed out on the project lot. Educate the sub contractors on the proper proceedures of washing out and washing of tools orther equipment that generate non storm water pollutants. Will re-inspect 7/17/2012 PM.
|
Random Inspection | 6/8/2012 | 6/8/2012 | 6/8/2012 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 5/11/2012 | 5/11/2012 | 5/11/2012 | A | PASS |
Jim Storey
|
|
|
|