Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC12-00364
StatusFinaled
Name CLAYTON BROOKS
Site Address 732 E SANTA PAULA PL
Project NameSingle Family home
Customer Number 
ePlanReviewNo
Description
foothills
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection1/26/20151/26/20151/26/2015 PASS
DetailsAndy J. Long
No activity on BLD since July. Homeowner is GC, RP and architect. No further inspections at this site. Front bank is stabilized/vegetated. No outstanding ESC issues.
DOC - Permit Finaled1/26/20151/26/20151/26/2015PPASS
DetailsAndy J. Long
General Inspection1/9/20151/9/20151/9/2015 PASS
DetailsAndy J. Long
General Inspection12/25/201412/25/201412/26/2014 CANC
DetailsAndy J. Long
General Inspection12/10/201412/10/201412/10/2014 PASS
DetailsAndy J. Long
General Inspection11/25/201411/25/201411/25/2014 PASS
DetailsAndy J. Long
General Inspection11/10/201411/10/201411/10/2014 PASS
DetailsAndy J. Long
No further earth disturbance for new construction. Still need final landscaping stabilization and BLD is still open. No ESC corrections needed.
General Inspection10/24/201410/24/201410/24/2014 PASS
DetailsAndy J. Long
No changes at site. BLD open, homeowner RP. No violations.
General Inspection10/9/201410/9/201410/9/2014 PASS
DetailsAndy J. Long
Pool, house, and landscaping all in progress. Final stabilization not yet attained, BLD permits still open. No corrections required. Pool has separate ESC permit.
General Inspection9/8/20149/8/20149/8/2014 PASS
DetailsEvan Jenkins
work in progress
no violations during inspection observed
General Inspection8/7/20148/7/20148/7/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
General Inspection7/7/20147/7/20147/7/2014 PASS
DetailsEvan Jenkins
near completion
General Inspection6/6/20146/6/20146/6/2014 PASS
DetailsAndy J. Long
Near completion. Not yet full landscaped around back and to the west.
General Inspection5/5/20145/6/20145/6/2014APASS
DetailsAndy J. Long
WIP. Exisiting vegetation at lot provides buffer from disturbance. Mainly interior work remaining. No corrections at this time.
General Inspection5/5/20145/5/20145/5/2014 CANC
DetailsAndy J. Long
Rescheduled for tomorrow AM.
General Inspection4/3/20144/3/20144/3/2014 PASS
DetailsAndy J. Long
General Inspection3/3/20143/3/20143/3/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
Construction sign posted in front of project as you drive up
General Inspection1/30/20141/30/20141/30/2014 PASS
DetailsAndy J. Long
General Inspection12/30/201312/30/201312/30/2013 PASS
DetailsAndy J. Long
WIP. BMPs installed. No trackout or other violations observed.
General Inspection11/28/201311/28/201311/29/2013 CANC
DetailsEvan Jenkins
Holiday
General Inspection10/28/201310/28/201310/28/2013 PASS
DetailsEvan Jenkins
Previous issues addressed
No ESC Issues at this time
General Inspection9/26/20139/26/20139/26/2013 FAIL
DetailsEvan Jenkins
Contractor to Replace Perimeter Waddles, Post New Signage with Contact Info, and designate Concrete Washout
General Inspection8/26/20138/26/20138/26/2013 PASS
DetailsDaryl Spivey
General Inspection7/25/20137/25/20137/25/2013PFAIL
DetailsKimberly M. Johnson
Verbal to RP: Maintain Silt fence and straw wattle perimeter controls on south side of property.
General Inspection7/4/20137/4/20137/5/2013 CANC
DetailsClint A Smith
Holiday
General Inspection6/3/20136/3/20136/4/2013 PART
DetailsClint A Smith
General Inspection5/2/20135/2/20135/2/2013 CANC
DetailsKimberly M. Johnson
General Inspection4/1/20134/1/20134/1/2013 PASS
DetailsClint A Smith
General Inspection2/28/20132/28/20132/28/2013 PASS
DetailsDaryl Spivey
General Inspection12/27/201212/27/201212/28/2012 PASS
DetailsDave Hannah
BMP Violation11/21/201211/26/201211/26/2012APART
DetailsClint A Smith
Will be completed tomorrow
BMP Violation11/19/201211/21/201211/21/2012ACANC
DetailsClint A Smith
could not reach RP, moved the inspection until 11/26
General Inspection11/19/201211/19/201211/19/2012 FAIL
DetailsClint A Smith
Message to RP:
Install a sediment barrier at the section above the court where disturbed soil back behind the basketball hoop on the slope. Will re-inspect on 11/21/2012
General Inspection10/18/201210/18/201210/19/2012 PASS
DetailsClint A Smith
General Inspection9/17/20129/17/20129/17/2012 PASS
DetailsClint A Smith
General Inspection8/17/20128/17/20128/17/2012 CANC
DetailsClint A Smith
General Inspection7/17/20127/17/20127/26/2012 PEND
DetailsTony Young
General Inspection6/15/20126/15/20126/15/2012 PASS
DetailsDaryl Spivey
Site Preparation5/10/20125/10/20125/16/2012 PART
DetailsDaryl Spivey
talked with Clint and he sched. himself for an inspection and gave a verbal to rp for silt barriers.............ds
Site Preparation5/11/20125/14/20125/15/2012APART
DetailsClint A Smith
Verbal to RP:
Install sediment barriers per industry standards prior to any storm events.
General Inspection1/28/20131/28/2013   
DetailsDixie Fellows