Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC12-00439
StatusFinaled
Name GREGG BARNEY
Site Address 2004 S POND ST
Project NameHillcrest Courtyards
Customer Number 
ePlanReviewNo
Description
Per Clint this permit to cover demo (Bld12-01048) and new SFD (Bld12-00883) since it will be same RP thoughout the entire project. They will demo 2010 Pond and new house will be 2004 Pond.//5/16/12 leg
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection7/15/20137/15/20137/15/2013 DONE
DetailsClint A Smith
DOC - Permit Finaled7/15/20137/15/20137/15/2013PPASS
DetailsClint A Smith
Aging Inspection5/14/20135/14/20135/15/2013 FAIL
DetailsClint A Smith
Verbal to RP:
Clean up all hard surfaces of all sediment and debris. Will follow up on 5/17/2013.
BMP Violation3/12/20133/18/20133/19/2013APASS
DetailsKimberly M. Johnson
Aging Inspection3/12/20133/12/20133/12/2013 FAIL
DetailsKimberly M. Johnson
Clean up and re-establish concrete washout pit; Clean up concrete on ground around mixer; Post ESC signs for each house (7 ESC permits); Sweep gutter
Aging Inspection1/8/20131/8/20131/8/2013 PASS
DetailsClint A Smith
Aging Inspection11/7/201211/7/201211/7/2012 PASS
DetailsTom Arcoraci
Random Inspection9/7/20129/7/20129/7/2012PPASS
DetailsJim Storey
BMP Violation8/27/20128/29/20128/30/2012APART
DetailsClint A Smith
Discussed with the RP over re-establishing his concrete washout where it is "leak proof". Will be fine if they place perimeter controls in once the sidewalk work is complete in mid Sept. But if any forecasted storm events occur, they must have perimeter control installed prior to the storm events.
Complaint Inspection8/24/20128/27/20128/27/2012AFAIL
DetailsClint A Smith
Discussed withthe RP over surpressing dust by utilizing control. Also explained to the RP that he shall install perimeter control along the back of sidewalk and post ESC sign. Will follow up on 8/29/2012
Random Inspection7/6/20127/6/20127/6/2012APASS
DetailsTom Arcoraci
Site Final6/26/20126/26/20126/26/2012ANR
DetailsJim Storey