General Inspection | 7/26/2012 | 7/26/2012 | 7/26/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 7/26/2012 | 7/26/2012 | 7/26/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/11/2012 | 7/11/2012 | 7/11/2012 | | PART |
Clint A Smith
|
|
|
Project is mostly complete. Just need to the sediment bags locted at two locations within the park.
|
General Inspection | 6/22/2012 | 6/22/2012 | 6/22/2012 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 6/5/2012 | 6/7/2012 | 6/7/2012 | A | PART |
Clint A Smith
|
|
|
|
General Inspection | 6/5/2012 | 6/5/2012 | 6/5/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Due to the evidence of erosion occuring at the top of the gabion baskets at the banks of the pond, they must be procected with a structural control to devert flows away from the section where the erosion has occured. Will follow up on 6/7/2012am
|
Site Preparation | 5/18/2012 | 5/18/2012 | 5/18/2012 | | PASS |
Clint A Smith
|
|
|
All documents from the other agencies have been submitted and contractor must follow the guidelines of the STAE from DEQ.
|