DOC - Permit Finaled | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | PASS |
Andy J. Long
|
|
|
See activity notes.
|
General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 | | PASS |
Andy J. Long
|
|
|
House complete, landscaped, and stabilized. No further ESC inspections required.
|
General Inspection | 11/11/2013 | 11/11/2013 | 11/12/2013 | | CANC |
Evan Jenkins
|
|
|
Holiday
|
General Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 | | PASS |
Andy J. Long
|
|
|
Construction is complete on house and landscaping is being installed. Ground FX was working to put bark down. Talked to employee Tim and discussed clean up of bark in gutter and street. He said they have brooms and blowers to clear bark onto property. Rest of site looks good.
|
General Inspection | 9/9/2013 | 9/9/2013 | 9/11/2013 | | PASS |
Tony Young
|
|
|
|
General Inspection | 8/8/2013 | 8/8/2013 | 8/16/2013 | | PASS |
Tony Young
|
|
|
|
General Inspection | 7/8/2013 | 7/8/2013 | 7/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 6/6/2013 | 6/6/2013 | 6/6/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/6/2013 | 5/6/2013 | 5/6/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/4/2013 | 4/4/2013 | 4/4/2013 | | PART |
Clint A Smith
|
|
|
Waiting on the road work to be completed before the stabilization surrounding the resivoir begins.
|
General Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 | | PASS |
Rock A. Hudson
|
|
|
|
General Inspection | 12/31/2012 | 12/31/2012 | 12/31/2012 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 11/29/2012 | 11/30/2012 | 11/30/2012 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 11/29/2012 | 11/29/2012 | 11/29/2012 | A | FAIL |
Clint A Smith
|
|
|
Message to RP; Maintain the sediment barriers at the front of the project lot. Will re-inspect on 11/29/2012
|
General Inspection | 11/9/2012 | 11/9/2012 | 11/9/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/9/2012 | 10/9/2012 | 10/10/2012 | | PART |
Kimberly M. Johnson
|
|
|
extended disturbance passed wattles providing perimeter control along Highland Dr. Met with RP on site and he want to stabilize the disturbed area with gravel. Recommended he contact ACHD for concurrence since this is in ACHD ROW
|
General Inspection | 9/7/2012 | 9/7/2012 | 9/7/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 8/7/2012 | 8/7/2012 | 8/8/2012 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 7/25/2012 | 7/25/2012 | 7/25/2012 | | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 6/22/2012 | 6/22/2012 | 6/26/2012 | | NR |
Bill VanDegrift
|
|
|
no work
|