Permit Information
Permit NumberESC12-00539
StatusFinaled
Name RANDY REUTZEL
Site Address 4000 E WARM SPRINGS AVE
Project NameHarris Ranch
Customer Number 
ePlanReviewNo
Description
Dallas Harris Estates Development 8 & 9. Plan mod to include 3 additional acres of disturbance for Warm Springs Creek Widening approved 11/29/12. Additional 4 acres disturbance added to permit for equipment staging and stockpiling on 2/5/13 for creek widening project.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/30/201410/30/201410/30/2014 PASS
DetailsAndy J. Long
finaled
DOC - Permit Finaled10/30/201410/30/201410/30/2014PPASS
DetailsAndy J. Long
DH #8-9 development is complete and majority of parcels filled with homes. Now area of disturbance around Warm Springs Creek is covered under the active ESC permit for the new phase (ESC14-00608)
General Inspection10/15/201410/15/201410/15/2014 PASS
DetailsAndy J. Long
No activity. No trackout or erosion issues. Not yet stabilized and cleared of stockpiles.
General Inspection9/30/20149/30/20149/30/2014 PASS
DetailsAndy J. Long
General Inspection9/15/20149/15/20149/15/2014 PASS
DetailsAndy J. Long
Scope of work on phase DH estates #8-9 is complete, but construction materials and stockpiles are still present and adajacent to new phase #12 construction.

No trackout or improper material storage observed.

ACHD sweeper was onsite doing routine sweeping. (unrelated)
General Inspection8/29/20148/29/20148/29/2014 PART
DetailsAndy J. Long
Phase is complete but creek area overlaps area of activity for phase 12 of Dallas Harris. CN issued to Knife River to sweep Old Hickory.
General Inspection8/14/20148/14/20148/14/2014 PASS
DetailsAndy J. Long
General Inspection7/30/20147/30/20147/30/2014 PASS
DetailsAndy J. Long
Some stockpiles remain in between DH Estates #9 and #12 which may need to be removed per this permit if not the DH#12 permit. DH #8 is finished with no open parcels remaining.

No corrections needed at this time.
General Inspection7/15/20147/15/20147/15/2014 PASS
DetailsAndy J. Long
Some of the area is being used for work related to Harris Rance #12 so will keep open at this time. Construction on phase 9-10 for site development is complete. No corrections at this time.
General Inspection6/30/20146/30/20146/30/2014 FAIL
DetailsAndy J. Long
Landscapers for either Hunter or Tahoe are using open area for stockpiling and construction related activity. Tracking sediment and gravel onto Old Hickory.

CN posted on machine to sweep up at end of day or SWO will be used to prevent the activity. Will check back tomorrow.
General Inspection6/13/20146/13/20146/13/2014 PASS
DetailsAndy J. Long
No new issues. Tahoe and Hunter continuing work on homes, each permited individually. Contractors using washouts and stockpiling in open areas has halt. No corrections at this time.
General Inspection5/29/20145/29/20145/29/2014 PASS
DetailsAndy J. Long
Subdivision development is complete. Hunter and Tahoe using designated washouts. Illegal dumping has stopped at Wolftree and Old Hickory. No corrections at this time.
General Inspection5/14/20145/14/20145/14/2014 PASS
DetailsAndy J. Long
Dallas Harris Estates No. 8 & 9 streets, sidewalks, and gutters are clean. Had K&H replace DI filters that were in need of maintenance. I also instructed Syman to begin to remove DI bags in completed sections.

Area at end of Wolf Tree east of Old Hickory is no longer being used as a stockpile and washout spot. Still need to figure who will clean it, although it is slated to be future development soon. Will continue to monitor. Parcel is owned by Harris family.
General Inspection4/29/20144/29/20144/29/2014 PEND
DetailsAndy J. Long
Contractors have stopped using illicit washout off Old Hickory after I posted a notice and red tag to use the lined washouts. Still working on who will clean the dried concrete up. No discharges or trackout to main roads, neighborhood DI bags in good condition. No complaints received.
General Inspection4/14/20144/14/20144/14/2014 PASS
DetailsAndy J. Long
CGP related to this permit is in Tahoe Homes' name (#IDR12CQ04). Going to have Hunter Homes remove old orange silt fence along Timbersaw Dr.

Staging to the East of Old Hickory is okay since permit was altered for this in February 2013.
General Inspection3/28/20143/28/20143/28/2014 PART
DetailsAndy J. Long
Area to the east of Old Hickory is still being used for stockpiling. Area is mostly occupied by Hunter Homes and Tahoe Homes, who are responsible for BMP maintenance and sweeping.

Hunter homes RP in process of emptying washout and providing new lining. Sweeping will be done this weekend.

No major issues, just general housekeeping.
General Inspection3/13/20143/13/20143/13/2014 PASS
DetailsAndy J. Long
General Inspection2/26/20142/26/20143/4/2014 PASS
DetailsAndy J. Long
BMPs installed. Subidivision development complete, individual BMPs and washout areas maintained by Hunter Homes. No violations observed.
General Inspection2/11/20142/11/20142/11/2014 PASS
DetailsAndy J. Long
No blowouts or failures in area. Hunter Homes keeping individual projects clean.
General Inspection1/27/20141/27/20141/27/2014 PASS
DetailsAndy J. Long
General Inspection1/10/20141/10/20141/10/2014 PASS
DetailsAndy J. Long
No sediment laden snowmelt runoff from open plots observed. BMPs are effective. Stockpiles to East of Old Hickory may be associated with the creek widening project. Will monitor conditions when snow has melted.
General Inspection12/26/201312/26/201312/26/2013 PASS
DetailsAndy J. Long
Dallas Harris No. 8-9 are not fully developed or stabilized. Areas with activity have perimeter BMPs. No corrections required at this time.
General Inspection12/11/201312/11/201312/11/2013 PASS
DetailsAndy J. Long
General Inspection11/26/201311/26/201311/26/2013 PASS
DetailsAndy J. Long
General Inspection11/11/201311/11/201311/12/2013 CANC
DetailsEvan Jenkins
Holiday
General Inspection10/25/201310/25/201310/25/2013 PASS
DetailsAndy J. Long
No track out observed. Vertical construction with individual permits on going. Open spaces have down slope perimeter BMPs. Stockpiles across from Old Hickory will need to be moved at end of use.
General Inspection10/10/201310/10/201310/10/2013 PASS
DetailsAndy J. Long
General Inspection9/25/20139/25/20139/27/2013 PASS
DetailsEric Strole
General Inspection9/10/20139/10/20139/10/2013 CANC
DetailsBill VanDegrift
General Inspection8/26/20138/26/20138/26/2013 PASS
DetailsEric Strole
General Inspection8/9/20138/9/20138/9/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/25/20137/25/20137/26/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/10/20137/10/20137/10/2013 PASS
DetailsClint A Smith
General Inspection6/25/20136/25/20136/25/2013 PASS
DetailsClint A Smith
General Inspection6/10/20136/10/20136/11/2013 PASS
DetailsClint A Smith
General Inspection5/24/20135/24/20135/24/2013 PASS
DetailsClint A Smith
General Inspection5/9/20135/9/20135/9/2013 PASS
DetailsClint A Smith
General Inspection4/24/20134/24/20134/24/2013 PART
DetailsClint A Smith
Completing paving oppertations. Will be protecting stormdrain inlet in the near future
General Inspection4/9/20134/9/20134/9/2013 PASS
DetailsClint A Smith
General Inspection3/25/20133/25/20133/25/2013 CANC
DetailsClint A Smith
General Inspection3/8/20133/8/20133/8/2013PPASS
DetailsClint A Smith
Have completed the with initating stabilization measures in thewarm springs creek widening portion of the phase 8 and 9 modification.
General Inspection3/6/20133/6/20133/6/2013 PART
DetailsClint A Smith
General Inspection2/15/20132/19/20132/20/2013APART
DetailsClint A Smith
approved the channel stabilization. Explained to RP to please apply the hydrolic application as soon as practicable. Also to install rip rap where the exsisting channel connect with the new cut channel.
Tracking Control2/8/20132/12/20132/12/2013PPASS
DetailsClint A Smith
RP to extend entrance to 50' and perform routine street sweeping along Wolf Creek
Tracking Control2/5/20132/5/20132/8/2013PFAIL
DetailsKimberly M. Johnson
Spoke with RP: Construction entrance was improved 2/7/13; Will bring in more rock to increase construction entrance length to 50 ft on 2/9 and will perform street sweeping. Re-inspect scheduled for 2/12
Conference2/1/20132/6/20132/5/2013PDONE
DetailsKimberly M. Johnson
contingency plan due and made operational bgy 2/6/13. Stop Work order lifted. Plan implemented to control runon 2/1/2013; Plan modified and fees paid for additional disturbance 2/5/2013.
BMP Violation2/4/20132/4/20132/4/2013PPART
DetailsKimberly M. Johnson
Developer's investigation found that the majority of the runoff was entering the project area from the farmers irrigation ditch and not from the north section of Warm Springs Creek. Developer and contractor made efforts to reinstate the historical flow of the agricultural ditch (with landowners approval) and has diverted flow away from construction. This diversion ditch and dam shall be included in SWPPP inspections to ensure it is functioning properly. Runoff from Warm Springs Creek entering the site from the north side shall be monitored during SWPPP inspections and during the next runoff event to ensure water continues to be adequately diverted and that the one foot of freeboard at the discharge point is maintained at all times. If it is found that runoff is entering the project from Warm Springs Creek, Contractor and developer must be ready to implement a contingency plan to divert this water to the farmers irrigation canal or other approved method. In order to be ready to act on the contingency plan, other permitting agencies.may need to be notified

2. The total permitted area for ESC12-00539 includes 13 acres for Harris Ranch Phases 8 and 9 and an additional three acres for the Warm Springs Creek Widening Project. The material staging area for equipment and stockpiling was not on the approved plan. Please calculate the total disturbance area for the permit and amend your plan accordingly. You will also need to update your ESC permit with the additional disturbance. The permit fee for each additional acre of disturbance is $52.50. Once we square up on this, we can lift the stop work order.
Site Preparation1/31/20132/1/20132/1/2013AFAIL
DetailsKimberly M. Johnson
1:30 PM. Met with RP (Randy), City Inspector and Public Works. Stop work order issued.Contractor did not follow plan. Work was to be performed during the seasonally low flow/dry season. Turbid water was discharged from the site. No controls were in place per City inspector on 1/31/13. At time of inspection on 2/1/2013, rock check dams were in place.Contractor must submit a plan to Boise City PDS on how they will prevent discharging turbid water. Discussed several options with the RP. Discussed weather forecast during meeting. Next weather event anticipated on Wednesday (2/6/13). Must have plan and contingency plan in place by then.
Stop Work Order2/1/20132/1/20132/1/2013PDONE
DetailsKimberly M. Johnson
1:30 PM. Met with RP (Randy), City Inspector and Public Works. Stop work order issued.Contractor did not follow plan. Work was to be performed during the seasonally low flow/dry season. Turbid water was discharged from the site. No controls were in place per City inspector on 1/31/13. At time of inspection on 2/1/2013, rock check dams were in place.Contractor must submit a plan to Boise City PDS on how they will prevent discharging turbid water. Discussed several options with the RP. Discussed weather forecast during meeting. Next weather event anticipated on Wednesday (2/6/13). Must have plan and contingency plan in place by then.
Site Preparation1/31/20131/31/20131/31/2013AFAIL
DetailsClint A Smith
Verbal to RP;
Add additional serdiment barriers at the covert entrance before crossing the road. Will meet with RP tomorrow at 11am for a Site preparation inspection with the ESC plan.
General Inspection1/18/20131/18/20131/18/2013 PART
DetailsClint A Smith
Have not begun the creeking widening phase yet.
General Inspection1/3/20131/3/20131/3/2013 PASS
DetailsClint A Smith
General Inspection12/19/201212/19/201212/19/2012 PART
DetailsClint A Smith
Have not begun the Warmsprings creek widening due to permiting.
General Inspection12/4/201212/4/201212/5/2012 PASS
DetailsClint A Smith
General Inspection11/19/201211/19/201211/19/2012 PART
DetailsClint A Smith
No activity on this portion of the development.
General Inspection10/25/201211/2/201211/2/2012APASS
DetailsClint A Smith
General Inspection10/25/201210/25/201210/25/2012 PART
DetailsClint A Smith
No activity. If project stays inactive more than 14 days the disturbed area must have initiation of temporary or perminate stabilization measures. The propsed schedule verbally spoken by the P.M. will be starting up next week. Will follow up on 1/1/2012
General Inspection10/10/201210/10/201210/10/2012 PART
DetailsKimberly M. Johnson
Lot on eastern side is scheduled to be stabilized after completion of infill. RP to install sediment control if stabilization is not completed before next forecasted rain event. Earth moving activities expected to be temporarily suspended and stabilization expected to be complete end of October. Work active in this area at time of inspection.
General Inspection9/25/20129/25/20129/25/2012 PART
DetailsClint A Smith
Home builder has allowed a concrete truck to washout in an area of the project that needs to be cleaned up and the home builder must provide a washout. Contacted Tahoe Homes RP to deal with the situation. Please refer to ESC12-00809
General Inspection9/7/20129/7/20129/7/2012 PASS
DetailsClint A Smith
General Inspection8/23/20128/23/20128/23/2012 PASS
DetailsClint A Smith
BMP Violation8/7/20128/8/20128/8/2012PPASS
DetailsKimberly M. Johnson
Random Inspection7/30/20127/30/20127/30/2012PFAIL
DetailsKimberly M. Johnson
The inlet protection on the new allies are not properly sized. RP has already contacted supplier to order larger cut mats. Entrance to phase 9 off of Warm Springs requires maintenance. New inlets must be protected with a physical barrier in addition to push broom/vacuum when finishing. No dust issues yet but the potential exists in phase 9 from the trucks driving on the loose soil. Loads are moistened and produce no dust when dumped. Inlet at the intersection of Wise/Warm Springs will require close attention due to the fact that irrigation water runs down the gutter into the disturbed construction zone.
BMP Violation7/11/20127/13/20127/13/2012APASS
DetailsClint A Smith
General Inspection7/11/20127/11/20127/11/2012 FAIL
DetailsClint A Smith
Verbal to RP:
Protect all new storm drains through out the new paved phase. Will re-inspect on 7/13/2012
General Inspection6/25/20126/25/20126/25/2012 PASS
DetailsClint A Smith
Site Preparation6/8/20126/8/20126/8/2012 NR
DetailsClint A Smith
Have not begun ground breaking activities yet.