General Inspection | 1/26/2015 | 1/26/2015 | 1/26/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 1/26/2015 | 1/26/2015 | 1/26/2015 | P | PASS |
Evan Jenkins
|
|
|
complete
|
General Inspection | 12/25/2014 | 12/25/2014 | 12/26/2014 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/24/2014 | 11/24/2014 | 11/24/2014 | | PART |
Evan Jenkins
|
|
|
No Activity. Temp BMP's still in place
|
General Inspection | 10/23/2014 | 10/23/2014 | 10/23/2014 | | PART |
Evan Jenkins
|
|
|
Per previous conversations with RP and Project managers about temp BMP Removal, Waddles are still in place
|
General Inspection | 9/22/2014 | 9/22/2014 | 9/22/2014 | | PASS |
Evan Jenkins
|
|
|
Temp BMP's still in place. once they are removed, permit will be closed out
|
General Inspection | 8/21/2014 | 8/21/2014 | 8/21/2014 | | PASS |
Evan Jenkins
|
|
|
Contacted Kent via phone. He verified the project has been complete for sometime now. He is going to call the project manager to have them remove the BMP's, then I will close out this permit
|
General Inspection | 7/21/2014 | 7/21/2014 | 7/21/2014 | | PASS |
Evan Jenkins
|
|
|
BMP's still in place no activity
|
General Inspection | 6/19/2014 | 6/19/2014 | 6/19/2014 | | PASS |
Evan Jenkins
|
|
|
Called RP Kent; he stated they have been completed with this project for approximately 1yr. and that United Water was supposed to take over. Kent stated he will get with united water to verify, and pull BMP's. Then he will call me back
|
General Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/17/2014 | 4/17/2014 | 4/17/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/17/2014 | 3/17/2014 | 3/17/2014 | | PASS |
Evan Jenkins
|
|
|
same comments as andy no esc issues at time of inspection
|
General Inspection | 2/13/2014 | 2/13/2014 | 2/13/2014 | | PASS |
Andy J. Long
|
|
|
No changes or activity. BMPs still installed along access road. No corrections required.
|
General Inspection | 1/13/2014 | 1/13/2014 | 1/13/2014 | | PASS |
Evan Jenkins
|
|
|
same comments as andy
|
General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 | | PASS |
Andy J. Long
|
|
|
No further construction activity. BLD is still open. Silt fence and wattles still installed while stabilization is in progress. Will need to be removed at Final. No corrections at this time.
|
General Inspection | 11/11/2013 | 11/11/2013 | 11/12/2013 | | CANC |
Evan Jenkins
|
|
|
Holiday
|
General Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 | | PASS |
Evan Jenkins
|
|
|
No activity at time of inspection. No ESC corrections at this time. Tank looks complete but BLD permit is still open...need to confirm status.
|
General Inspection | 9/9/2013 | 9/9/2013 | 9/10/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/8/2013 | 8/8/2013 | 8/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 7/8/2013 | 7/8/2013 | 7/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Waiting for vegetation. Temporary mulch stabilization is in place.
|
General Inspection | 6/6/2013 | 6/6/2013 | 6/6/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/6/2013 | 5/6/2013 | 5/6/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/4/2013 | 4/4/2013 | 4/4/2013 | | PART |
Clint A Smith
|
|
|
Waiting on road work compleetion for stabilization measuresto be implimented.
|
General Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 | | PART |
Clint A Smith
|
|
|
Waiting on stabilization requirements
|
General Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/31/2012 | 12/31/2012 | 12/31/2012 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 11/29/2012 | 11/29/2012 | 11/29/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/29/2012 | 10/29/2012 | 10/29/2012 | A | PASS |
Tony Young
|
|
|
|
Site Preparation | 10/15/2012 | 10/15/2012 | 10/15/2012 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 10/12/2012 | 10/12/2012 | 10/15/2012 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | | | 10/10/2012 | A | PASS |
Kimberly M. Johnson
|
|
|
|
Site Preparation | 9/17/2012 | 9/17/2012 | 9/17/2012 | | PASS |
Clint A Smith
|
|
|
|