Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC12-00628
StatusFinaled
Name JAMES LARKIN
Site Address 8792 W PINE VALLEY LANE
Project NamePine Tree Village Bldg 600
Customer Number 
ePlanReviewNo
Description
Per the attached ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection11/12/201311/12/201311/12/2013 PASS
DetailsAndy J. Long
This phase is complete and stabilized. No further ESC inspections required for this permit. Ongoing construction in other phases of Pine Tree Village.
DOC - Permit Finaled11/12/201311/12/201311/12/2013PPASS
DetailsAndy J. Long
Aging Inspection9/10/20139/10/20139/10/2013 CANC
DetailsBill VanDegrift
Aging Inspection5/8/20135/8/20135/8/2013 FAIL
DetailsClint A Smith
Voicemail to RP:
Clean up all sediment and debris off of the hard surfaces in the alleyway and street side as well. Will follow up on 5/10/2013
Aging Inspection3/6/20133/6/20133/8/2013 PASS
DetailsMike Jordan
General Inspection3/8/20133/8/20133/8/2013PPASS
DetailsMike Jordan
Aging Inspection1/3/20131/3/20131/3/2013 PASS
DetailsClint A Smith
Random Inspection10/29/201210/29/201210/29/2012PPASS
DetailsJim Storey
Tracking Control9/26/20129/26/20129/26/2012APART
DetailsMike Jordan
Excavation work is in progress. Contractor to sweep har surfaces as needed to avoid trackout and at end of work shift.
Tracking Control9/24/20129/24/20129/24/2012PPART
DetailsMike Jordan
Excavation work work in progress. Contractor to sweep hard surfaces as needed to avoid trackout and at end of working day.
Site Preparation9/21/20129/21/20129/21/2012PPART
DetailsMike Jordan
Excavation work in progress. Will need to sweep all hardsurfaces as needed to avoid trackout and at end of work day.
Random Inspection9/14/20129/14/20129/14/2012APASS
DetailsMike Jordan
Random Inspection9/10/20129/10/20129/10/2012PPASS
DetailsMike Jordan
Random Inspection9/7/20129/7/20129/7/2012PPART
DetailsMike Jordan
Site Preparation8/30/20129/6/20129/6/2012 PART
DetailsClint A Smith
Verbal to RP:
Clean up on a daily basis in required to remove all sediment and material off of the hard surfaces.
Aging Inspection7/9/20137/9/2013   
DetailsMike Jordan