Site Preparation | 6/19/2013 | 6/19/2013 | 6/19/2013 | P | PASS |
Jim Sly
|
|
|
Final Pass.
|
DOC - Permit Finaled | 6/19/2013 | 6/19/2013 | 6/19/2013 | P | PASS |
Jim Sly
|
|
|
|
Aging Inspection | 5/1/2013 | 5/1/2013 | 5/1/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/25/2013 | 2/25/2013 | 2/25/2013 | A | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 1/4/2013 | 1/4/2013 | 1/4/2013 | | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 9/26/2012 | 9/26/2012 | 9/26/2012 | A | PART |
Mike Jordan
|
|
|
Excavation work is in progress. Contractor to sweep har surfaces as needed to avoid trackout and at end of work shift.
|
Random Inspection | 9/18/2012 | 9/18/2012 | 9/18/2012 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 9/11/2012 | 9/11/2012 | 9/11/2012 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 9/6/2012 | 9/6/2012 | 9/6/2012 | P | PART |
Mike Jordan
|
|
|
Excavation work in progress, clean up as needed and at end of day.
|
Site Preparation | 8/30/2012 | 9/6/2012 | 9/6/2012 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Clean up on a daily basis in required to remove all sediment and material off of the hard surfaces.
|
Site Preparation | 9/5/2012 | 9/5/2012 | 9/5/2012 | P | PART |
Mike Jordan
|
|
|
ESC permit sign posted, concrete washout in place. noted excavation work will be inprogress for the next several weeks. Hardsurfaces to be cleaned as needed and at end of day.
|
Site Preparation | 8/30/2012 | 8/30/2012 | 8/30/2012 | A | NR |
Clint A Smith
|
|
|
|